Tender Value
₹14.3 L
EMD Value
₹14,330
Closing Date
6 Oct 2026, 3:00 pm
Unit Head,HHEP,Burla
O/O Sr.GM(El),HHEP,Burla
CONSTRUCTION OF STORM WATER DRAIN OF F-13, F-14 AND F-36 BLOCKS OF BOARD COLONY OF HHEP, BURLA
2026_OHPCL_141486_1
HHEP-77/2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Burla
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹14,330
Yes
23 Sept 2026
23 Sept 2026
6 Oct 2026
23 Sept 2026
6 Oct 2026
23 Sept 2026
23 Sept 2026 - 3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in ordinary soil in embankments, roads etc within 50 mtrs initial lead and 1.5 mtrs initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth alongwith proper compaction by PRR including hire & running charges of PRR including mechanical carriage of 5km and as per direction of Engineer-in-charge. | 533.62 | Cum | 451.5 | ₹2,40,929.43 |
| 2 | Supply & filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc complete | 14.18 | Cum | 767.7 | ₹10,885.99 |
| 3 | Cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc complete | 14.18 | Cum | 6,223.1 | ₹88,243.56 |
| 4 | RCC works of 1:1.5:3 with 12mm & down grade black hard granite chips (crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of TOR steel) and cost of all labour with T&P required as per direction of Engineer-in-charge | 51.05 | Cum | 8,830.6 | ₹4,50,802.13 |
| 5 | Cutting, bending, binding and laying the grill of approved dia and placing in position of TOR steel (IS 7686:2000) for RCC works and using binding wire 18 to 20 gauge including cost, conveyance, taxes of all materials and labour complete as per direction of Engineer-in-charge | 51.05 | Qntl | 9,199.3 | ₹4,69,624.26 |
| 6 | Rigid and smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of materials complete for foundation, plinth band and footings, bases of columns, mass concrete, precast slabs. | 686.65 | Sqm | 250.2 | ₹1,71,799.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
DTCN772026.pdf
Tender Documents • 1.80 MB
OfficememorandumAPS.pdf
Additional Documents • 1.18 MB
BOQ_610500.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .