Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-Finance | ₹17.1 L | L1 | Accepted-Finance Lowest 1 |
| 2 | l2₹23.4 L+₹6.3 L (36.6%)Accepted-Finance | ₹23.4 L+₹6.3 L (36.6%) | l2 | Accepted-Finance Lowest 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Annexure B not uploaded |
| Sl No | Description | Qty | Unit | M/s T.G Enterprise L1 | M/s Rongsar Enterprises L2 |
|---|---|---|---|---|---|
| 1.00Sub heads and Items of Work | |||||
| 2.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in15 cm layers when required, into plinth, sides of foundation etc consolidating each depositedlayer by ramming and watering and then disposing of all surplus excavated soil as directedwithin a lead of 50m. | 90.65 | Cum | 16,243.57 ₹16,243.57 | 11,314.03 ₹11,314.03 Lowest |
| 3.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete | 63.6 | Cum | 34,246.06 ₹34,246.06 Lowest | 83,499.8 ₹83,499.8 |
| 4.00 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering | 12.46 | Cum | 34,099.03 ₹34,099.03 Lowest | 45,798.72 ₹45,798.72 |
| 5.00 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 2.59 | Cum | 12,871.81 ₹12,871.81 Lowest | 13,160.05 ₹13,160.05 |
| 6.00 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 5 | Cum | 28,394.6 ₹28,394.6 Lowest | 30,936.15 ₹30,936.15 |
| 7.00 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give smooth surface.
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 6.48 | Cum | 37,203.95 ₹37,203.95 Lowest | 52,742.99 ₹52,742.99 |
| 8.00 | Centring and shuttering including strutting, propping etc and removal of form work for :Foundation, footings, bases of columns etc. and mass concrete. | 17.28 | Sqm | 3,831.67 ₹3,831.67 | 3,232.57 ₹3,232.57 Lowest |
| 8.10 | Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). | 1.83 | Sqm | 845.83 ₹845.83 Lowest | 852.16 ₹852.16 |
| 8.20 | Lintels, beams, girders, bressumers and cantilevers etc. | 96.3 | Sqm | 28,133.08 ₹28,133.08 Lowest | 35,591.52 ₹35,591.52 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
22 Jul 2026, 6:55 pmClosed
Deputy Director Rural Development Yingkiong
Office of Deputy Director Rural Development Yingkiong
CONSTRUCTION OF MULTIPURPOSE COMMUNITY HALL AT TASHIGAON VILLAGE.
2026_DRDAP_3515_10
No. YRD/VVP/2025-26/NIT
Open Tender
Civil Works
Item Rate
180 days
Tashigong
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Payable To Deputy Director, Rural Development Depa
₹30,000
1 Aug 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub heads and Items of Work | |||||
| 2 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in15 cm layers when required, into plinth, sides of foundation etc consolidating each depositedlayer by ramming and watering and then disposing of all surplus excavated soil as directedwithin a lead of 50m. | 90.65 | Cum | - | - |
| 3 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete | 63.6 | Cum | 65 | ₹4,134 |
| 4 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering | 12.46 | Cum | 65 | ₹809.9 |
| 5 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 2.59 | Cum | 65 | ₹168.35 |
| 6 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 5 | Cum | 65 | ₹325 |
| 7 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give smooth surface.
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 6.48 | Cum | 75 | ₹486 |
| 8 | Centring and shuttering including strutting, propping etc and removal of form work for :Foundation, footings, bases of columns etc. and mass concrete. | 17.28 | Sqm | 65 | ₹1,123.2 |
| 8.1 | Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). | 1.83 | Sqm | 65 | ₹118.95 |
| 8.2 | Lintels, beams, girders, bressumers and cantilevers etc. | 96.3 | Sqm | 65 | ₹6,259.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_3749.xls
BOQ • 0.40 MB
pkg10.pdf
Tender Documents • 20.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .