| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC MOHALLA KSAKRA TEHSIL DISTT CHAMBA HIMACHAL PRADESH 176310 | CHAMBA | HIMACHAL PRADESH | 176310 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 CrRejected-AOC | ₹1.3 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 CrRejected-AOC | ₹1.4 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹1.6 CrRejected-AOC | ₹1.6 Cr | L4 | Rejected-AOC L4 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
31 Jan 2026, 6:00 pmClosed
General Manager (E n C), P and C, NHPC CPS 2
General Manager (E n C) Procurement - Contracts Division, NHPC Office Complex, Chamera- II Power Station, Karian, Chamba (HP) 176310
Providing and placing PP rope gabions and Tetrapod from RD 400.0 M to RD 530.0 M (EL1155.0 to EL1164.00) at CPS-II Dam site
2026_NHPC_893458_1
NH/CPS- II/Cont./E File-156056/2025-26/13
Open Tender
Civil Works
180 days
NHPC CPSII
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
NHPCC LTD
₹3.3 L
Yes
11 Apr 2026
11 Jan 2026
5 Feb 2026
11 Jan 2026
31 Jan 2026
11 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Supplying & placing partly or fully underwater of 16 mm 4-strand Polypropylene (PP) Rope tarred quoted Gabions (UV stabilized) with 150x150 mm aperture and size 2mx1mx1m with single partition as per the specification and properly packed with approximately 225mm size boulders including transportation and placing at indicated places as per direction of engineer-in-charge with contractor's tools, plants, labour etc. including carrying the material by head load from nearest approach with all leads and lifts.
Providing & laying concreting up to floor five level precast cement concrete solid block(Tetrapod) , including centering, shuttering complete :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.cold twisted bar.
Transportation of precast elements by flat back trailor (Double / Triple axle 40ft Length with proper accessories like A frame etc) from factory, including the cost of loading , unloading & stacking at site with the help of required capacity cranes.Lead within 15km
Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor. Solid concrete wall elements
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_939111.pdf
techsummary_939111.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_939111.xls
BOQ • 0.28 MB
TENDERDOCS.pdf
Tender Documents • 19.34 MB
Download all tender documents and submit your bid