Tender Value
₹8.6 Cr
EMD Value
₹17.2 L
Closing Date
15 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
ACE PWD ZONE-II UDR HQ BANSWARA
ACE PWD ZONE-II UDR HQ BANSWARA
Widening and Strengthening work on Koiwab-Jahanpura -Unkala-Semalkheda-Katumb i-Padala-Ambapura- Kushalgarh-Churada -Chhota Dungra- Jalimpura-Jher-Gangartalai- Anandpuri Road (MDR-336) Km. 98/0 to 105/0
2026_CEPWD_571347_1
NIT 05/2026-27 ACE PWD ZONE-II UDR HQ BANSWARA
Open Tender
Civil Works
BANSWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
AS MENTIONED IN NIT AND CONDITIONS
₹17.2 L
Yes
ACE PWD ZONE-II UDR HQ BANSWARA
26 Jun 2026
26 Jun 2026
16 Jul 2026
26 Jun 2026
15 Jul 2026
26 Jun 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means (A) In area of non-thorny jungle | 3.69 | Hect | 10,374 | ₹38,280.06 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202.
By Mechanical Means
Bituminous Courses & Granular Courses | 1,193.5 | Cum | 69 | ₹82,351.5 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 7,642.6 | Cum | 25 | ₹1,91,065 |
| 4 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 1,910.65 | Cum | 36 | ₹68,783.4 |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 14,339.5 | Cum | 44 | ₹6,30,938 |
| 6 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 9,553.25 | Cum | 33 | ₹3,15,257.25 |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 9,125 | Cum | 45 | ₹4,10,625 |
| 8 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.
For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri Ganganagar
(iii) For Grading-III Material | 2,558.61 | Cum | 738 | ₹18,88,254.18 |
| 9 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri Ganganagar | 11,385.95 | Cum | 1,044 | ₹1,18,86,931.8 |
| 10 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 41,603.25 | Sqm | 28 | ₹11,64,891 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 12.18 MB
1POT.pdf
Tender Documents • 0.81 MB
1FIN.pdf
Tender Documents • 14.44 MB
BOQ_1016583.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid