Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance NOT AVAILABLE | ₹5.2 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹5.4 L+₹21,360 (4.08%)Rejected-Finance | ₹5.4 L+₹21,360 (4.08%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RAMESH KUMAR L1 | rupinder justa govt contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge. | 18 | Cum. | 430 ₹7,740 Lowest | 450 ₹8,100 |
| 2.00 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. | 6.9 | Cum. | 11,000 ₹75,900 Lowest | 11,500 ₹79,350 |
| 3.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 25mm (Forty millimeter nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per direction of Engineer - in charge. | 4.2 | Cum. | 11,500 ₹48,300 Lowest | 12,000 ₹50,400 |
| 4.00 | R/R masonary/polygone rubble masonry (uncoursed/brought to course) with hard stone of approved quality in foundation & plinth including levelling up with cement concrete 1:6:12 (1cement:6sand:12aggrigate 20mm nominal size)at plinth level in CM 1:6 (1cement:6sand) within all leads and lifts as per the directions of the Engineer in charge. | 46 | Cum. | 8,100 ₹3,72,600 Lowest | 8,400 ₹3,86,400 |
| 5.00 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. | 8.25 | Cum. | 2,300 ₹18,975 Lowest | 2,500 ₹20,625 |
Tender Value
₹5.2 L
EMD Value
₹10,350
Closing Date
30 Jul 2026, 11:00 amClosed
Executive Engineer
JSV Division Jubbal
RM of LWSS Padara Bajoha and Serti in GP Tharola Tehsil Kotkhai Distt Shimla HP SH Construction of RR masonry wall to protect the civil structure at Marathu stage 1st from RD 0/0 to 0/20 20 Mtr long
2026_HPIPH_139452_3
JBL-SML-09-718
Open Tender
Civil Works
Item Rate
180 days
Kotkhai
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹10,350
1 Sept 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge. | 18 | Cum. | 641.64 | ₹11,549.52 |
| 2 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. | 6.9 | Cum. | 10,042.89 | ₹69,295.94 |
| 3 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 25mm (Forty millimeter nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per direction of Engineer - in charge. | 4.2 | Cum. | 10,656.39 | ₹44,756.84 |
| 4 | R/R masonary/polygone rubble masonry (uncoursed/brought to course) with hard stone of approved quality in foundation & plinth including levelling up with cement concrete 1:6:12 (1cement:6sand:12aggrigate 20mm nominal size)at plinth level in CM 1:6 (1cement:6sand) within all leads and lifts as per the directions of the Engineer in charge. | 46 | Cum. | 8,068.21 | ₹3,71,137.66 |
| 5 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. | 8.25 | Cum. | 2,279.71 | ₹18,807.61 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
f6.pdf
Tender Documents • 0.15 MB
BOQ_206699.xls
BOQ • 0.34 MB
f8.pdf
Tender Documents • 0.70 MB
tc.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .