Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance | ₹6.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.0 L+₹7,109 (1.02%)Rejected-Finance | ₹7.0 L+₹7,109 (1.02%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SHREE SAI CONSTRUCTIONS L2 | A Annadurai L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff Clay, Stiff black cotton, Hard Red earth, Shales, Murram Gravel, Stoney earth and Earth mixed with small Boulders and Hard gravelly soil including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 303 | m3 | 311 ₹94,233 | 308 ₹93,324 Lowest |
| 1.10 | Labour charges for cutting open road for laying water mains including all cost etc., complete | 29 | m3 | 939 ₹27,231 | 929 ₹26,941 Lowest |
| 1.20Supply and delivery of following Pipes and Specials as per standard specifications etc. complete | |||||
| 1.30 | 160mm PVC Pipe 6 KSC for Covering | 12 | Rm | 435 ₹5,220 | 430 ₹5,160 Lowest |
| 1.40 | 90mm PVC Pipe 6 KSC | 90 | Rm | 235 ₹21,150 | 232 ₹20,880 Lowest |
| 1.50 | 110mm PVC Pipe 6 KSC | 450 | Rm | 308 ₹1,38,600 | 305 ₹1,37,250 Lowest |
| 1.60 | 5/81/2 Bolt, nut and washer | 10 | Kgs | 48 ₹480 Lowest | 48 ₹480 Lowest |
| 1.70 | Rubber Sheet | 5 | Kgs | 122 ₹610 | 121 ₹605 Lowest |
| 1.80 | 100 mm DI Sluice Valve | 16 | Set | 14,165 ₹2,26,640 | 14,012 ₹2,24,192 Lowest |
| 1.90 | 100 mm DI Flange Set | 20 | Nos | 360 ₹7,200 | 356 ₹7,120 Lowest |
Tender Value
₹8.3 L
EMD Value
₹8,300
Closing Date
27 Feb 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Providing and laying of 90mm and 110mm PVC Distribution Main Line and 100mm DI Sluice Valve for Improvement of Water Supply at Div No.1
2026_MAWS_658964_1
E2-EST NO-241-WS-2025-2026
Open Tender
Civil Works
Lump-sum
30 days
Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,300
7 Jul 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff Clay, Stiff black cotton, Hard Red earth, Shales, Murram Gravel, Stoney earth and Earth mixed with small Boulders and Hard gravelly soil including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 303 | m3 | - | - |
| 1.1 | Labour charges for cutting open road for laying water mains including all cost etc., complete | 29 | m3 | - | - |
| 1.2 | Supply and delivery of following Pipes and Specials as per standard specifications etc. complete | - | - | - | - |
| 1.3 | 160mm PVC Pipe 6 KSC for Covering | 12 | Rm | - | - |
| 1.4 | 90mm PVC Pipe 6 KSC | 90 | Rm | - | - |
| 1.5 | 110mm PVC Pipe 6 KSC | 450 | Rm | - | - |
| 1.6 | 5/81/2 Bolt, nut and washer | 10 | Kgs | - | - |
| 1.7 | Rubber Sheet | 5 | Kgs | - | - |
| 1.8 | 100 mm DI Sluice Valve | 16 | Set | - | - |
| 1.9 | 100 mm DI Flange Set | 20 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_790585.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .