Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85,000Accepted-Finance 194A LUKER GANJ ALLAHABAD UP | ALLAHABAD | ALLAHABAD | UP | 211001 | L1 | Accepted-Finance Admit | |
| 2 | L2₹89,800+₹4,800 (5.65%)Accepted-Finance 114 SHASTRI NAGAR MEERUT | MEERUT | UTTAR PRADESH | 245206 | L2 | Accepted-Finance Admit |
Tender Value
Refer Docs
EMD Value
₹1,722
Closing Date
17 Feb 2021, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE SOUTH
GE SOUTH MEERUT CANTT
JOB ORDER FOR REPAIR MAINTENANCE OF MECHANICAL LAUNDRY SYSTEM INSTALLED AT HQ 22 DIV CAMP
2021_MES_418456_1
3005/03/E3
Open Tender
Job Works
Works
30 days
HQ 22 INF DIV CAMP
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1,722
Yes
19 Feb 2021
3 Feb 2021
18 Feb 2021
3 Feb 2021
17 Feb 2021
4 Feb 2021
45 days
Amount
Industrial Washing Machne-70 Kgs (i) Disconnecting the electrical connections and dismantling for serviceing oiling greasing to all movable/mechanical parts including all electrical connections for industrial washing machine of capacity 70 kgs and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of DTC temp controller-01 Nos (iii) Replacement of sensor-01 Nos (iv) Replacement of indicator lamp neon type-02 Nos
Industrial Washing Machne-35 Kgs (i) Disconnecting the electrical connections and dismantling for serviceing oiling greasing to all movable/mechanical parts including all electrical connections for industrial washing machine of capacity 35 kgs and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of DTC temp controller-01 Nos (iii) Replacement of sensor-01 Nos (iv) Replacement of reverse and forward speed controller-01 Nos (v) Replacement of electrical panel base plate made out of stainless steel as per existing size and thickness complete set to work with welding/screwing.
Indutrial Hydro Extractor of Capacity 25 Kgs (i) Disconnecting the electrical connections and dismantling for serviceing oiling greasing to all movable/mechanical parts including all electrical connections for industrial hydro extractor of capacity 25 kgs and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of DTC temp controller-01 Nos (iii) Replacement of indicator lamp neon type-02 Nos (iv) Replacement of timer controller of range 0-15min-01 Nos (v) Replacement of reverse and forward speed controller-01 Nos (vi) Replacement of conrractor 3 phase 18A -02 Nos (vii) Replacement of single phase preventor-02 Nos (viii) Replacement of machine mounting spring -06 Nos (ix) Replacement of NONC auxillary contact block -03 Nos
Dying Tumbler of Capacity 60 Kgs (i) Disconnecting the electrical connections and dismantling for serviceing oiling greasing to all movable/mechanical parts including all electrical connections for Dying Tumber of capacity 60 kgs and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of contractor 3 phase 18A-01 Nos (iii) Replacement of single phase preventor -02 Nos (iv) Replacement oftimer controller of range 0-60min -01 Nos (v) Replacement of reverse and forward speed controller-01 Nos
Steam boiler 400Kgs/Hrs (i) Disconnecting the electrical connections and dismantling of burner assy serviceingand calibration of burner and all movable/mechanical parts including all electrical connections for Steam boilerr of capacity 400kg/hrs and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of Sequence controller electric panel -01 Nos (iii) Replacement ofPressure Switch -01 Nos (iv) Replacement of safety valve -01 Nos
Air Compressure of capacity 7 Kgs/Cum2 (i) Dismanted electric driven motor and dismantling of pully of motor servicing oiling/greasing to all movable/mechanical parts including all electrical connections for air compressure of capacity 7kgs/cum2 and making serviceable in all respect including testing and commissioning and replacing of following parts/components make X Soni Systems (ii) Replacement of ball bearing of exiting size -02 Nos (iii) Replacement of air pipe line of suitable size up to pressure -10 kgs/cum2 -05 Mtr (iv) Replacement of indicator lamp neon type-01 Nos (v) Replacement of Butterfly valve 50mm dia -01 Nos (vi) Replacement of butterfly valve 15mm dia -02 Nos
Jain Traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .