Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹15.4 L | L1 | Accepted-AOC Less Quoted Estimate Rate |
| 2 | L2₹15.7 LRejected-AOC THIRU K RISHIKESAVAN CONTRACTOR WALAJABAD KANCHEEPURAM DISTRICT | ₹15.7 L | L2 | Rejected-AOC Above Quoted Estimate Rate |
| Sl No | Description | Qty | Unit | M.LOGANATHAN L1 | K.RISHIJESAVAN L2 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Road to Prasanna Nagar Ist and 2nd cross street in Valluvapakkam at Muthiyalpettai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,. | 17.1 | Cum | 263 ₹4,497.30 | 303 ₹5,181.30 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity | 67.26 | Cum | 2,590 ₹1.7 L | 2,630 ₹1.8 L |
| 4.00 | C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 78.66 | Cum | 5,478 ₹4.3 L | 5,518 ₹4.3 L |
| 5.00 | Towards the labour charges for centering the C.C.Works including all other labour charges etc, complete. | 247 | Cum | 547 ₹1.4 L | 587 ₹1.4 L |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 28.4 | Sqm | 6,775 ₹1.9 L | 6,815 ₹1.9 L |
| 7.00 | Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 50.44 | Sqm | 7,320 ₹3.7 L | 7,360 ₹3.7 L |
| 8.00 | Cost and supply of Bitumen pad including all labour charges etc complete | 10.09 | Sqm | 234 ₹2,361.06 | 274 ₹2,764.66 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,35,566.19 ₹2.4 L | 2,39,158.63 ₹2.4 L |
Tender Value
Refer Docs
EMD Value
₹15,600
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO BP
BDO BP
Providing Cement Concrete Road to Prasanna Nagar Ist and 2nd cross street in Valluvapakkam at Muthiyalpettai Panchayat
2026_RDTN_661350_1
2791/2024/A2 Dt 19.02.2026
Open Tender
Civil Works - Roads
90 days
BDO WALAJABAD
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹15,600
Yes
30 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
Providing Cement Concrete Road to Prasanna Nagar Ist and 2nd cross street in Valluvapakkam at Muthiyalpettai Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Towards the labour charges for centering the C.C.Works including all other labour charges etc, complete.
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cost and supply of Bitumen pad including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_793778.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_793778.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid