| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance 74 DHURA RESHEP BAZAR P O MANGPO DARJEELING | DARJEELING | WEST BENGAL | 734001 | ₹1.4 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹1.4 CrRejected-Finance BANSBOTAY LODHAMA DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹1.4 Cr | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.4 CrRejected-Finance | ₹1.4 Cr | L3 | Rejected-Finance Being L3 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
13 Jan 2026, 3:55 pmClosed
Executive Engineer TED
OFFICE OF THE EXECUTIVE ENGINEER TAKDAH ENGINEERING DIVISION 6TH MILE NAYA BUSTY, DARJEELING GTA
Construction of Gandhi Primary School at Mungpoo bazar under R.R. Block, G.T.A
2025_GTA_977322_1
GTA/EE/TED/NIeT-08(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
270 days
Takdah
AS PER NIeT
4 documents required · 4 mandatory
₹1.4 Cr
₹2.7 L
Yes
20 Feb 2026
20 Dec 2025
16 Jan 2026
20 Dec 2025
13 Jan 2026
20 Dec 2025
Ground Floor Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directed within a lead of 75 m a) In ground floor including roof.
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars a)In ground floor including roof.
Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. Payment to be made on measurement of portion Paymnt of roof or wall removed.)
Dismantling carefully wood work in posts, postplates, rafters, partition etc., sorting and stacking serviciable materials at site and removing rubbish as directed
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Siliguri .(a) Depth of excavation not exceeding 1.500 mm.
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.In ground floor or foundation(b) N.B. veriety (a) 1:3:6 proportion
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the nterstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Rubble masonry in cement (1:4) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and einforcement if any in ground floor as per relevant IS codes. (ii) River Bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.Others
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor) (a)25mmto30mm thick wooden shuttering as per decision & direction of the Engineer-in -charge.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
125 mm thick brick work with 1st class brick's in Cement mortar (4:1) in ground floor.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. a) with (4:1) cement mortor (a)20mm thick plaster
b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Timber or Plastered Surface iv)(Two Coats)
Supplying, fitting, fixing marble b/tiles,15mm. to 18mm. thick in dado/wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass/coper hooks applying white cement slurry @4.4 kg/sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement,2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, pigment to be suplied by the Agency](b) With Makrana plain plnk/Adranga plnk/.(ii) Area of each tile exceeing 0.3 sq.m. but not exceeding 0.6 sq.m.
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). ( c) Sal : local
Supplying solid flush type doors of deluxe decorative (both side) quality, conforming to I:S 2202 timber frame consisting of top and bottom rail and side styles of well seasoned timber 65mm wide each and the entire frame fitted with 27.5mm wide battens places both ways in order to made the door of solid core and internal lipping with teak, mahogony or rose wood approved decorative veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing the shutters in position but excluding the cost of hinges and other fittings in ground floor:a) 35mm thick shutters (single leaf)
Supplying, Fitting & Fixing Factory made P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm, PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm long M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer‟s specification and direction of Engineer-in-Charge.
Supplying, Fitting & Fixing 30 mm thick both side prelaminated Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in- Charge.
Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron[Note : for estimate purpose construction wing may consider weight of 2- track Aluminium window @ 5.5 Kg per Sq.M.and 3-track Aluminium window @ 6.5 Kg per Sq.M]
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Supplying, fitting and fixing windows and ventilators with or withoutintegrated grills conforming to IS 1038-1975 and manufactured fromrolled steel sections conforming to IS 7452-1974 with non-frictionprojecting type, box type hinges, glazing clips, lugs locking bracket,handle plate etc, including hoisting in position, straightening ifrequired, fixing lugs in cement concrete ( 1:2:4) with stone chips 20mm down cutting holes and mending good damages to match withexisting surface complete in all respect excluding glazing.(Add extra @ 1.2 % for each additional floors upto 4th floor and @1.5% for each addl. Floor above 4th floor.)In Ground floorFlash butt welded windows and ventilators(No shop priming will be allowed to facilitate inspection ofworkmanship)Without integrated grill (b) Openable steel windows as per IS sizes with side hung shuttersand horizotal glazing bars. [The extra rate admissible for theopenable portion only]
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete (In all floors for internal wall & upto 6m height for external wall ).(i) 3 mm. thick (weighing 7.4 kg/sq.m.).
supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately).(c)40mm x 6mm, 250mm Length .
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. (vi) 100mm x 75 mm x 3.50 mm.
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S.230/72) fitted and fixed complete:.(a) With continuous plate base (hexagonal/round rod).(iv) 150 mm grip x 10 mm dia rod.
Anodised aluminium barrel/ tower/socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium lated screws.(vi) 200mm longx10mm dia bolt
Anodised aluminium Aldrop/ Sliding bolt of approved manufactured from extruded ction conforming to I.S. 2681/66 fitted and fixed complete. (i) 250 mm 16 mm dia bolt
Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessaryholes, chasing etc. in walls, floors etc. and making good damages complete.(Add extra @ 1% for each addl. floor upto 5th floor and @ 1.25% for each addl. floor above 5th floor)In ground floor.
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Steel or other metal Surface iv)(Two Coats)
First Floor Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and einforcement if any in ground floor as per relevant IS codes. (ii) River Bazree.(Add above ground floor,1st floor)
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.Others.(Add above ground floor,1st floor)
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor) (a)25mmto30mm thick wooden shuttering as per decision & direction of the Engineer-in -charge.(Add above ground floor,1st floor)
125 mm thick brick work with 1st class brick's in Cement mortar (4:1) in ground floor.(Add above ground floor,1st floor)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. a) with (4:1) cement mortor (a)20mm thick plaster.(Add above ground floor,1st floor)
b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Timber or Plastered Surface iv)(Two Coats)
Supplying, fitting, fixing marble b/tiles,15mm. to 18mm. thick in dado/wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass/coper hooks applying white cement slurry @4.4 kg/sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement,2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, pigment to be suplied by the Agency](b) With Makrana plain plnk/Adranga plnk/.(ii) Area of each tile exceeing 0.3 sq.m. but not exceeding 0.6 sq.m.
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). ( c) Sal : local
Supplying solid flush type doors of deluxe decorative (both side) quality, conforming to I:S 2202 timber frame consisting of top and bottom rail and side styles of well seasoned timber 65mm wide each and the entire frame fitted with 27.5mm wide battens places both ways in order to made the door of solid core and internal lipping with teak, mahogony or rose wood approved decorative veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing the shutters in position but excluding the cost of hinges and other fittings in ground floor:a) 30mm thick shutters (single leaf).(Add above ground floor,1st floor)
Supplying, fitting and fixing windows and ventilators with or withoutintegrated grills conforming to IS 1038-1975 and manufactured fromrolled steel sections conforming to IS 7452-1974 with non-frictionprojecting type, box type hinges, glazing clips, lugs locking bracket,handle plate etc, including hoisting in position, straightening ifrequired, fixing lugs in cement concrete ( 1:2:4) with stone chips 20mm down cutting holes and mending good damages to match withexisting surface complete in all respect excluding glazing.(Add extra @ 1.2 % for each additional floors upto 4th floor and @1.5% for each addl. Floor above 4th floor.)In Ground floorFlash butt welded windows and ventilators(No shop priming will be allowed to facilitate inspection ofworkmanship)Without integrated grill (b) Openable steel windows as per IS sizes with side hung shuttersand horizotal glazing bars. [The extra rate admissible for theopenable portion only]
Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron[Note : for estimate purpose construction wing may consider weight of 2- track Aluminium window @ 5.5 Kg per Sq.M.and 3-track Aluminium window @ 6.5 Kg per Sq.M]
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.(Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor)
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete (In all floors for internal wall & upto 6m height for external wall ).(i) 3 mm. thick (weighing 7.4 kg/sq.m.).
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Steel or other metal Surface iv)(Two Coats)
Supplying, Fitting & Fixing Factory made P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm, PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm long M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer‟s specification and direction of Engineer-in-Charge.
Supplying, Fitting & Fixing 30 mm thick Double Leaf Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5 mm th. both side PVC sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge. In ground floor. etc. complete excluding all necessary hardwares as per direction of Engineer-in- Charge.
supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately).(c)40mm x 6mm, 250mm Length .
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. (vi) 100mm x 75 mm x 3.50 mm.
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S.230/72) fitted and fixed complete:.(a) With continuous plate base (hexagonal/round rod).(iv) 150 mm grip x 10 mm dia rod.
Anodised aluminium barrel/ tower/socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium lated screws.(vi) 200mm longx10mm dia bolt
Anodised aluminium Aldrop/ Sliding bolt of approved manufactured from extruded ction conforming to I.S. 2681/66 fitted and fixed complete. (i) 250 mm 16 mm dia bolt
Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m
Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m
Supplying, fitting, fixing marble slab/tiles,15mm. to 18mm. thick in dado/wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass/coper hooks applying white cement slurry @4.4 kg/sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement,2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, pigment to be suplied by the Agency](b) With Makrana plain plnk/Adranga plnk/.(ii) Area of each tile exceeing 0.3 sq.m. but not exceeding 0.6 sq.m.
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessaryholes, chasing etc. in walls, floors etc. and making good damages complete.(Add extra @ 1% for each addl. floor upto 5th floor and @ 1.25% for each addl. floor above 5th floor)In ground floor.
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)
Second Floor Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and einforcement if any in ground floor as per relevant IS codes. (ii) River Bazree.(Add above ground floor,2nd floor)
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.Others.(Add above ground floor,2nd floor)
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor) (a)25mmto30mm thick wooden shuttering as per decision & direction of the Engineer-in -charge.(Add above ground floor,2nd floor)
125 mm thick brick work with 1st class brick's in Cement mortar (4:1) in ground floor.(Add above ground floor,2nd floor)
Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails and side styles of well seasoned timber 65mm wide each and the entire frame fitted with 37.5mm wide battens places both ways in order to make the door of solid core and internal lipping with Garjan or similar wood veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing shutters in position but excluding the cost of hinges and other fittings in ground floor.(b) 32 mm thick shutters (single leaf)
Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron[Note : for estimate purpose construction wing may consider weight of 2- track Aluminium window @ 5.5 Kg per Sq.M.and 3-track Aluminium window @ 6.5 Kg per Sq.M]
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. a) with (4:1) cement mortor (a)20mm thick plaster.(Add above ground floor,2nd floor)
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). ( c) Sal : Siliguri
Supplying, fitting and fixing windows and ventilators with or withoutintegrated grills conforming to IS 1038-1975 and manufactured fromrolled steel sections conforming to IS 7452-1974 with non-frictionprojecting type, box type hinges, glazing clips, lugs locking bracket,handle plate etc, including hoisting in position, straightening ifrequired, fixing lugs in cement concrete ( 1:2:4) with stone chips 20mm down cutting holes and mending good damages to match withexisting surface complete in all respect excluding glazing.(Add extra @ 1.2 % for each additional floors upto 4th floor and @1.5% for each addl. Floor above 4th floor.)In Ground floorFlash butt welded windows and ventilators(No shop priming will be allowed to facilitate inspection ofworkmanship)Without integrated grill (b) Openable steel windows as per IS sizes with side hung shuttersand horizotal glazing bars. [The extra rate admissible for theopenable portion only]
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.(Add Above 2nd floor))
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete (In all floors for internal wall & upto 6m height for external wall ).(i) 3 mm. thick (weighing 7.4 kg/sq.m.).
Supplying, Fitting & Fixing Factory made P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm, PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm long M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer‟s specification and direction of Engineer-in-Charge.
Supplying, Fitting & Fixing 30 mm thick Double Leaf Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5 mm th. both side PVC sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge. In ground floor. etc. complete excluding all necessary hardwares as per direction of Engineer-in- Charge.
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables suchas electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS i) For trusses spanning up to 12.00 m and upto 20.00m(Add above ground floor,2nd floor)
Supplying, fitting & fixing circular corrugated Aluminium sheet (excluding the supporting frame work) of approved make & brand in alloy 3105 conforming to IS: 1254-1991 fitted and fixed with 55 mm & 25 mm Self tapping screw ,EPDM Washer 16 mm dia & 3 mm th washer etc complete with 150 mm. end lap and one corrugation minimum side lap.(Payment to be made on area of finished work) (Aluminium sheet to be supplied by contractor).a) With 0.65 mm thick sheet
Aluminium sheet ridging fitted with self tapping screws,EPDM washers etc complete.(Minimum 225mm end lapping). (A) 300 mm lapping each way(a) With 0.71 mm sheet
Galvanised iron sheet eaves gutter fitted and fixed with necessary 50 mm X 6 mm M.S flat bar clamps bent to design, bolts, nuts, washers etc. complete. Eaves gutter made of 0.63mm. sheets.(300mm End lapping)(a)225 mm. wide gutter)
Wooden eaves board as per design, fitted and fixed complete:In ground floor (iii) Ornamental eaves boardbadam/Gamar/Champ/Hallak) (a) 19mm thick
P.V.C- False Ceiling : Providing False Ceiling made with framework of steel tube of 40mm x 20mm of not less than 18 gauge,the long and cross section will be welded with each other 1000mm to 1200mm apart the entire framework will be fixed in wall using rawlplug or gutties or screws etc. and suspended from ceiling with M.S flat 19mmx3mm as necessary,the entire frame will be painted with red oxide. PRINTED LAMINATED P.V.C Section 150mm x 12mmx 1.00mm (+/- 0.01mm) of approved quality and colour will be fixed on the frame so that the entire framework will not be visible from below P.V.C Section will be fixed with the frame with the help of self tapping steel screws including all materials and labour charges including fitting,fixing the same and hoisting including mending the damages in all respect and cost of paint as required as per direction of Engineerin- Charge . In ground floor.
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessaryholes, chasing etc. in walls, floors etc. and making good damages complete.(Add extra @ 1% for each addl. floor upto 5th floor and @ 1.25% for each addl. floor above 5th floor)In ground floor.
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.(A) UPVC Pupes(ii) 110 mm. Dia.
b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Timber or Plastered Surface iv)(Two Coats)
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)
Supplying, fitting, fixing marble slab/tiles,15mm. to 18mm. thick in dado/wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass/coper hooks applying white cement slurry @4.4 kg/sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement,2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, pigment to be suplied by the Agency](b) With Makrana plain plnk/Adranga plnk/.(ii) Area of each tile exceeing 0.3 sq.m. but not exceeding 0.6 sq.m.
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Steel or other metal Surface iv)(Two Coats)
Sanitary and plumbing Construction of Septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (4:1) including two 560 mm dia. R.C.C. manhloe cover of approved make supplied, fitted and fixied in the top slab with necessary fittings, 19 mm thick cement plaster(4:1) with neat cement finish to the internal surfaces and 12 mm thick plaster(4:1) to outside wall upto 200 mm below G.L. floor finished with 25 mm thick grey artificial stone including supplying, fitting and fixing all necessary specials, fittings, S.W. tees, C.I. foot rest etc. including excavating earth in all sorts of soil, shoring, bailing and pumping out water as necessary, ramming, dressing the bed and refilling the sides of the tank with earth, removing spoils, fliing up the chamber with clear water, removing foreign materialsfrom the chamber and including constructing attached inspection pit as per approved dawing and connecting all necessary pipes, joints etc. with internal plaster work and artifFor 50 users.with( pukar.Variety).
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm(depth) with 250 mm thick 1st. class brick work in cement mortar(4:1) on all sides, bottom of the pit consisting of 100 mm thick cement concrete(1:6:3) with stone chips over a layer of jhama brick flat soiling, 15 mm thick (1:4) cement plaster to inside walls and outside walls upto G.L. and 20 mm thick(1:4) plaster to bottom of the pit, providing necessary invert with cement concrete(1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster(1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in theafter work complete in all respect with all costs of labour and materials.with Pukar.Variety). (JSW/JSP/SHYAM)
Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work(6:1) band all round and cement brick work(6:1) upto 0.90 metre from top with 19 mm thick cement plastering(4:1) to inside face upto the depth of cement brick work, 12 mm thick cement plaster(4:1) on top of the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal(50 mm to 63 mm size) including R.C.C. cover slab of designed thickness with cement concrete(4:2:1) with stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the cover slab with necessary fittings, making necessary arrangements for pipe conections, excavation of well including shoring, dewatering and remeving the excess earth from the premisis as per direction complete in all respect with all costs of labour and materials.With 250 mm thick dry brick work and 250 mm thick cement brick work(6:1) and 1.00 m. inside dia.
Supplying, fitting & fixing Cast iron soil pipe only conforming to I.S. 3989/ 2009 and I.S. 1729/2002 with bobbins, nails etc. including making holes in the wall, floor etc. and cutting trenches etc. in any floor through masonry concrete, if necessary, and mending good damages with necessary jointing materials and painting two coats to the exposed surface with approved paint complete. (Measurement will be made along the center line of the total pipe line in fitted condition including specials,payment for specials & Painting will however be paid seperately).With valamoid joints including sealing with sand cement morter (4:1)100 mm dia. (internal)
Supplying, fitting and fixing white vitreous china best quality approved make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks,C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved quality P.V.C. connection pipe with heavy brass C.P. nut including mending good all damages and painting the brackets with two coats of approved paint.ii) 550 mm X 400 mm size
Supplying, fitting and fixing 10 litre P.V.C. low-down cistern conforming to I.S. Specification with P.V.C. fittings complete, C.I. brackets including two coats of painting to bracket etc.
Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer(b) 1000 litre capacity
Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.(a) For Exposed Work(i) CPVC Pipes Class-1, SDR-1125 mm
Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.(a) For Exposed Work(i) CPVC Pipes Class-1, SDR-11 40mm
Supplying, fitting and fixing Shallow water closet Indin pattern (I.P.W.C) of approved make in white vitreous chinaware in position (excluding cost of concrete for fixing).500 mm long.
Supplying, fitting and fixing E.W.C. in white glazed vitreous chinaware of approved make complete in position with necessary bolts, nuts etc.(b) With 'S' trap
Supplying, fitting and fixing G.I. gravity operated water tap for public use with pilfer proof arrangement of approved brand and make..(ii) 20 mm dia.
Supplying, fitting and fixing soap holder. (a) PTMT (Prayag or equivalent).
Supplying, fitting and fixing bib cock or stop cock.(a) (i) Chromium plated Bib Cock short body (Equivalent to Code No. 511 & Model - Tropical / Sumthing Special of ESSCO or similar brand).
Supplying,fitting and fixing approved brand 32 mm dia.P.V.C. waste pipe, with PVC coupling at one end fitted with necessary clamps.iv) 1050 mm long
Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S.3989/ 2009 and 1729/ 2002 including lead caulked joints and painting two coats to the exposed surface. (Painting to be paid seperately).(B) 'S' Trapiii) 100 mm
Supply of High Density Poly-ethylene Pipe conforming to IS - 4984 - 1985 (Dia) [PE - 63]B. 10 Kg / Sq.Cm. (Working Pressure) 20 mm
Boundary Fencing Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Siliguri .(a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the nterstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cost of stone boulder 150 mm size delivered ans stacked at site.
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.In ground floor or foundation(b) N.B. veriety (a) 1:3:6 proportion
Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and einforcement if any in ground floor as per relevant IS codes. (ii) River Bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.Others
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor) (a)25mmto30mm thick wooden shuttering as per decision & direction of the Engineer-in -charge.
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. a) with (4:1) cement mortor (a)20mm thick plaster
b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Timber or Plastered Surface iv)(Two Coats)
Painting with best quality synthetic enamel paint of approved make and brand including smoothing surface by sand papering including using of approved putty e.t.c on the surface if necessary.a)on Steel or other metal Surface iv)(Two Coats)
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
Add 18 % GST
Add 1 % Laboaur Cess
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
TenderForm.pdf
Tender Documents • 0.94 MB
BOQ_2381323.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid