Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹1,607.06 (1.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,380
Closing Date
25 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONST OF FOOTPATH FOR AWANGWADI CENTRE POTPORA CHEERKOTE B
2026_RDPR_325135_24
NIT NO 121 OF 2026-27 ADF GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹4,380
2 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
18 Sept 2026 - 18 Sept 2026
30 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal | 3.08 | cum | 479.3 | ₹1,475.11 |
| 2 | Providing/Laying of dry stone soling, tightly hand packed including al carriages | 2.71 | cum | 900 | ₹2,438.75 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.29 | cum | 5,733 | ₹47,537.46 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 25.5 | sqm | 287 | ₹7,318.8 |
| 5 | Supplying, filling, spreading and leveling GSB/Nallah muck i/c carriage | 10.07 | cum | 1,000 | ₹10,070.8 |
| 6 | Providing and Laying cement conc. of specified grade M 7.5 (1:4:8) mix stone agg size 40mm. Including all carriages /head load | 4.97 | cum | 5,202.9 | ₹25,849.82 |
| 7 | Centring and shuttering incld strutting propping etc and removal of formwork | 4.67 | sqm | 286.9 | ₹1,338.69 |
| 8 | Providing and Laying of cement concrete of specified grade M10(1:3:6) mix using Stone agg size 20mm. | 0.71 | cum | 5,733.5 | ₹4,069.43 |
| 9 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 42.36 | sqm | 816 | ₹34,567.72 |
| 10 | Carriage of material by M/T OF 35KM | 18.86 | cum | 500 | ₹9,429.76 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1098016.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .