Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical CHUBI LEH | LEH LADAKH | LADAKH | 194101 | Accepted-Technical Responsive |
| 2 | Accepted-Technical 1ST FLOOR LEH TYRERONG LEH MANALI HIGHWAY NEAR HP PETROL PUMP COLONY LEH LADAKH 194101 INDIA | LEH LADAKH | LADAKH | 194101 | Accepted-Technical Responsive |
| 3 | Accepted-Technical SK 157 SECTOR 116 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 INDIA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Accepted-Technical Responsive |
| 4 | Not Admitted-Fee/PreQual/Technical 847 LEH LADUPA ARTO VILLAGE TOWN IBEX COLONY CITY LEH LEH LADAKH LADAKH 194101 INDIA | LEH LADAKH | LADAKH | 194101 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
19 Sept 2026, 4:00 pmClosed
Executive Engineer PWD RnB Nubra
Executive Engineer PWD RnB Nubra
Infrastructure Development for Operationalization of the civil terminal at Thoise. (Under SDP)
2026_PWD_19525_1
28 of PWD RnB Nubra 2026-27
Open Tender
Civil Works - Buildings
Percentage
45 days
Nubra
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,750
Executive Engineer PWD RnB Nubra.
₹5.5 L
25 Sept 2026
9 Sept 2026
21 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil a) All kinds of soil. | 339.6 | Cum | 208.42 | ₹70,779.43 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 41.04 | Cum | 278.09 | ₹11,412.81 |
| 3 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 5.77 | Cum | 537.71 | ₹3,102.59 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | 3.85 | Cum | 5,725.33 | ₹22,042.52 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 23.47 | Cum | 7,993.55 | ₹1,87,608.62 |
| 6 | Structural steel work riveted, bolted or welded in buit up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying priming coat of approved steel primer. | 6,333.45 | kg | 157.4 | ₹9,96,885.03 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for a) Foundations, footings, bases of columns etc. for mass concrete | 376.2 | sqm | 306.15 | ₹1,15,173.63 |
| 8 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total
coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester
top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in
single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM
seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape
wherever required. | 1,402.43 | sqm | 703.86 | ₹9,87,114.38 |
| 9 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic
thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced
operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per
direction of Engineer-in-charge and accordance with applicable specifications | 69.5 | sqm | 597.64 | ₹41,535.98 |
| 10 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 190.35 | Cum | 278.09 | ₹52,934.43 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_46229.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .