| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.8 LAccepted-AOC BOKARO | BOKARO | JHARKHAND | 825102 | ₹58.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹59.4 L+₹59,429.82 (1.01%)Rejected-AOC AT WARD 34 NEAR STAFF BANK COLONY VIKASH NAGAR RATU ROAD HEHAL RANCHI | RANCHI | RANCHI | JHARKHAND | ₹59.4 L+₹59,429.82 (1.01%) | L2 | Rejected-AOC L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bidder substantially not responsive due to non compliance of ITB F2 Contract Sl. No. (B) (1) (vii) of F2 bid document |
Tender Value
₹59.4 L
EMD Value
₹1.2 L
Closing Date
27 Mar 2026, 5:00 pmClosed
Chief Engineer
Jharkhand Police Housing Corporation Limited Line Tank Road Ranchi 834001
Repairing work of Magazine Building at STF Sukurhuttu in the district of Ranchi.
2026_JPHCL_111115_1
JPHCL/GR 19/NIT 08/2025-26
Open Tender
Civil Works
Percentage
120 days
Ranchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.2 L
Yes
21 Sept 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
27 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Section- I Civil Works | - | - | - | - |
| 2 | 5.7.3
Providing 12mm thick cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I | 398.1 | SQM | 165.8 | ₹66,004.2 |
| 3 | 5.7.3
Providing 12mm thick cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I | 190.03 | SQM | 165.8 | ₹31,506.22 |
| 4 | 5.7.6
Providing 6mm thick cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scafolding taxes and royalty all complete as per buildings specification and direction of E/I. | 111.8 | SQM | 184.06 | ₹20,578.34 |
| 5 | 5.10.7
Disrnantling old plaster and pointing in cement or lime and raking out joints to 15mm. depth, watering and disposal of unserviceable materials with all leads all complete as per
direction of E/|. | 699.92 | SQM | 21.46 | ₹15,020.35 |
| 6 | 5.8.9
Extra for cleaning the old surface by scrapping the entire old white wash or colour wash rncluding cost of scaffolding all complete as per direction of E/I. | 1,819.49 | SQM | 12.59 | ₹22,907.39 |
| 7 | 5.8.18
Providing two coats of oil bound distemper of approved make & shade over a coat of cement primer over new surface including preparing the plastered surface by rubbing, smooth with pumic stone or fine sand paper, aplying putty wherever required, scaffolding , washing of flores and taxes etc. all complete as per building specification direction of E/I. | 509.9 | SQM | 90.16 | ₹45,972.37 |
| 8 | 5.8.17
Providing two coats of oil bound distemper of approved shade and make over old surface including washing, cleaning and papering the walls, scaffolding, washing of floors and taxes, all complete as per building specification and direction of E/l. | 1,819.49 | SQM | 74.27 | ₹1,35,133.61 |
| 9 | 5.8.41
Provinding primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing dirt, scales smokes and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. (Mode of measurment Area shall be multiplied by the co-efficient as indicated in building specificaton.) | 116.72 | m2 | 57.77 | ₹6,743.2 |
| 10 | 5.8.45
Providing two coats of synthetic enamel paint of approved shade and made over steel surface including cleaning the surface thoroughly including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction of E/I | 116.72 | M2 | 66.04 | ₹7,708.51 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Techbid19.pdf
Tender Documents • 7.11 MB
BOQ_150108.xls
BOQ • 0.47 MB
Datecorrigendum2nit8.pdf
PDF • 0.82 MB
Datecorrigendumnit8.pdf
PDF • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .