Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
13 Jul 2026, 6:00 pm5d left
Superintending Engineer Deeg
Superintending Engineer PHED Deeg
Construction and Commissioning of 200mm dia three phase Tube Well on Annual Rate Contract basis in Combination strata including defect liability period of two years in urban and rural area of District Deeg
2026_PHCJA_572334_1
NIT-05/26-27
Open Tender
Civil Works - Water Works
365 days
Deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer PHED
₹3 L
Yes
1 Jul 2026
1 Jul 2026
14 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. | - | - | - | - |
| 2 | Nominal bore 200 mm dia. | 1 | Per Mtr | 1,290.68 | ₹1,290.68 |
| 3 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | Per Mtr | 1,484.28 | ₹1,484.28 |
| 4 | Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | Per Mtr | 1,806.95 | ₹1,806.95 |
| 5 | Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. | - | - | - | - |
| 6 | Nominal bore 200 mm dia. | 1 | Per Mtr | 1,039.83 | ₹1,039.83 |
| 7 | Add 15% extra on above item (Item No 2.2.1 to 2.2.2) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . | 1 | Per Mtr | 1,195.81 | ₹1,195.81 |
| 8 | Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal
size bore beyond casing pipe. | - | - | - | - |
| 9 | Nominal bore 200 mm dia. | 1 | Per Mtr | 1,070.34 | ₹1,070.34 |
| 10 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | Per Mtr | 1,230.89 | ₹1,230.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
NIT05TD.pdf
Tender Documents • 3.93 MB
BOQ_1018245.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid