Loading…
Loading…
Tender Value
₹157.3 Cr
EMD Value
₹3.1 Cr
Closing Date
23 Jul 2026, 12:00 pmClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
CE/CON/II
18 conditions · 2 needing a document upload
Clause 2.2.2.2 of RFP: Financial Capacity: The Bidder shall have a minimum Net Worth (the "Financial Capacity") of Rs. 7,86,33,463.23/- (Rs. Seven crore eighty six lakh thirty three thousand four hundred sixty three and twenty three paise only) at the close of the preceding Financial Year.
Please see more details in RFP document as attached.
Clause 2.2.2.1 of RFP: Technical Capacity: For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year up to the Base month (not to be read with para-2.1.13). (i) have received payments for construction of Eligible Project(s), or has executed construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii). (ii) Completed (executed) or Substantially completed$(executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 50% (fifty per cent) of the Estimated Project Cost. However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 10% (ten) per cent of the Estimated Project Cost. (iii)(a) Completed (executed) or substantially completed$ (executed) at least one similar work of value of not less than [20% (Twenty percent)] of the estimated project cost. OR (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value of not less than [10% (Ten percent)] of the estimated project cost. Illustration for 'received payments for not less than 75 (seventy-five) percent': For contract wherein there is provision for part payment 'procurement of goods and equipment' on basis of indemnity bond/Bank Guarantee. In all such contract, 'received payments for not less than 75 (seventy-five) per cent value of present Contract Value payment' means not less than 75% payment received under 'procurement of goods and equipment' as well as not less than 75% payment received under 'execution/installation/commissioning'. For avoidance of doubt, in above cl. 2.2.2.1 (i), (ii) & (iii), the amount of payment received for eligible projects or amount of payments received against PPP project shall be considered for last past 5 (five) previous financial Years and current financial year up to the base month even if project was started earlier than the said reckoned period. The meaning of executed shall be considered as completed or in progress.
[Note:- For composite works of New lines, Gauge Conversion, Doubling, 3rd line, 4th line etc. with Railway electrification and/or Signalling and telecommunication works - 1.In case scope involves the electrification work as per item No. 3 of Annexure -I of Schedule -B value as mentioned in Annexure-G, the selected bidders can himself execute above Electrification work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated electrification work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute electrification work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include overhead equipment system of Railway electrification for a railway system, metro system, suburban transit system, high speed railways, substation and transmission lines, and/or 2. In case scope involves the Signalling and Telecommunication work as per item No. 2 of Annexure-I of Schedule-B value as mentioned in Annexure-G, the selected bidders can himself execute above Signalling and Telecommunication work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated Signalling and Telecommunication work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute Signalling and Telecommunication work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include Signalling and Telecommunication of railway system, metro system, suburban transit system, high speed railways.]
Please see more details in RFP document as attached.
Please also see clause 2.2.2.3 to 2.2.2.9 of RFP document as attached.
Definition of similar work: "Any composite Railway project work including all Civil Engineering, Permanent Way and Railway Electrification works".
38 conditions · 15 needing a document upload
LETTER COMPRISING THE TECHNICAL BID is to be furnished as per APPENDIX-IA of RFP document as attached.
Letter comprising the Financial Bid is to be furnished as per APPENDIX- IB of RFP document as attached.
Format for Power of Attorney for signing of Bid as per the format at Appendix-II in RFP document as attached.
If applicable, Power of Attorney for Lead Member of {Consortium/Joint Venture} as per the format at Appendix-III in RFP document as attached.
If applicable, Joint Bidding Agreement for {Consortium/Joint Venture} as per the format at Appendix-IV in RFP document as attached.
An undertaking from the person having Power of Attorney referred to in Sub. Clause-(b) above that they agree and abide by the Bid Documents uploaded by Authority and amendments uploaded, if any.
Copy of Memorandum and Articles of Association, if the Bidder is a body corporate, and if a partnership then a copy of its partnership deed.
Copies of duly audited complete annual accounts of the Bidder or of each member (in case of Joint Venture/Consortium) for preceding 5 years.
Appendix-IB shall be submitted online through e-procurement portal on or before 12:00 hrs IST on Bid due date.
Appendix-IC shall be submitted online through e-procurement portal on or before 12:00 hrs IST on Bid due date towards Contractor's Work Plan with full details of manpower, machinery, equipment, number of simultaneous sites listing all the activities from mobilization to completion along with S curves for all major activities like Earthwork, Concreting, Steel work etc.
Details of bidder is to be furnished as per Annexure I of RFP document as attached.
Technical Capacity of the Bidder is to be furnished as per Annexure II of RFP document as attached.
Financial Capacity of bidder is to be furnished as per Annexure III of RFP document as attached.
Details of Eligible Projects is to be furnished as per Annexure IV of RFP document as attached.
Statement of Legal Capacity is to be furnished as per Annexure V of RFP document as attached.
Earnest Money Deposit (Bid security): Payment of Earnest Money deposit (Bid Security) in respect of e-tendering, will be accepted through e- payment Gateway of Authority or submitted as Bank Guarantee Bond from a Scheduled Commercial Bank of India only and shall be refundable not later than 200 days from Bid Due Date. (RFP clause 1.2.4 as attached).
The tenderer shall upload scanned copies of mandatory credentials such as experience, turn over Certificates and any other documents as applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Request for Proposal for Construction of the Km: 400.169 to Km: 391.898 for 3rd line i.e. the 8.271 Km and the Km: 403.005 to Km: 392.300 for 4th line i.e. the 10.705 Km, total 18.976 Km between Sini and Kandra Junction, complete gauge conversion of the existing track over the same stretch, Civil Engineering works: earthwork in formation including cutting, filling, blanketing, turfing for new track alignment, extension and strengthening of minor bridges and construction of major bridges, construction of side drains for proper drainage, permanent way works including track linking and alignment, supply and laying of 50 mm machine crushed stone ballast as per railway specifications, associated civil and track works at Sini and Kandra block sections to support the new lines and gauge conversion, execution of indoor & outdoor S&T works in connection with clearance of infringement to facilitates the civil works for the 3rd and 4th Lines in the Sini- Kandra block section, execution of general electrical works, installation and commissioning of overhead equipment (OHE) for traction and power supply of Chakradharpur Division on S. E. Railway on Engineering, Procurement & Construction (EPC) Mode.
4627-GRC-CE-C-II-11-2026
4627-GRC-CE-C-II-11-2026
Open
Works - General
24 Months
Unknown (Unspecified Location)
₹0
₹3.1 Cr
4 Jun 2026
4 Jun 2026
9 Jul 2026
37 items across 3 schedules · ₹8,77,66,162.69 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Driving rails 90R/52 Kg section below average ground level within the slope/toe of embankment including making of nose with contractor's own arrangement complete in all respect Note: Payment will be made as per actual driven length of rail which will be supplied free by Railways at the site of work. | Metre | 1000.00 | 108.07 | 1,08,070 |
| 2 | Shoring with 'Z' section MS sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. | Sqm | 400.00 | 949.68 | 3,79,872 |
| 3 | All kinds of soils | cum | 1000.00 | 205.63 | 2,05,630 |
| 4 | Hard rock (blasting prohibited ) | cum | 500.00 | 1,184.98 | 5,92,490 |
| 5 | 1:2:4 (1 cement : 2 coarse sand (zone- III) : 4 graded stone aggregate 20 mm nominal size) | cum | 70.00 | 2,473.31 | 1,73,131.7 |
| 6 | P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 300.00 | 2,618.75 | 7,85,625 |
| 7 | Abutment & Pier | cum | 110.00 | 2,699.22 | 2,96,914.2 |
| 8 | Wing wall and Return wall | cum | 410.00 | 2,699.22 | 11,06,680.2 |
| 9 | Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. | cum | 40.00 | 2,739.46 | 1,09,578.4 |
| 10 | Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. | Metre | 200.00 | 246.59 | 49,318 |
| 11 | 1200mm diameter | Metre | 300.00 | 8,415.58 | 25,24,674 |
| 12 | Providing, fabricating and installing permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. | MT | 50.00 | 1,12,152.91 | 56,07,645.5 |
| 13 | Initial load test above 100 ton and up to 250 T capacity pile | Each | 1.00 | 80,406.11 | 80,406.11 |
| 14 | Extra for every increase of 50 ton in pile capacity or part thereof over 250 ton | Each | 2.00 | 5,217.99 | 10,435.98 |
| 15 | Routine Load Test above 100 ton capacity up to 250 ton capacity pile | Each | 1.00 | 40,203.06 | 40,203.06 |
| 16 | Piles with lateral load capacity of up to 50 ton | Each | 1.00 | 21,280.17 | 21,280.17 |
| 17 | Piles with lateral load capacity of above 50 ton and up to 100 ton | Each | 1.00 | 24,598.25 | 24,598.25 |
| 18 | Pulse Echo Test (PET) for integrity testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. | Each | 18.00 | 2,843.56 | 51,184.08 |
| 19 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 900.00 | 674.52 | 6,07,068 |
| 20 | Ordinary Portland Cement 53 grade of approved brands/makes | MT | 520.00 | 8,964.18 | 46,61,373.6 |
| 21 | Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes. | Kg | 265000.00 | 97.13 | 2,57,39,450 |
| 22 | For Span design load up to 100 MT | Each | 1.00 | 72,795.5 | 72,795.5 |
| 23 | Extra for every increase of 1 MT or part thereof over 100 MT in the span design load capacity up to 800 MT | MT | 800.00 | 306.23 | 2,44,984 |
| 24 | Supply & applying two coats of bitumen emulsion of Grade RS-1, conforming to IS:8887 on the top surface of concrete deck slab (New bridges) @ 1.70 kg/sqm after cleaning surface with all materials, labour, tools and plants, equipment etc. complete. | Sqm | 500.00 | 81.53 | 40,765 |
| 25 | Supplying of stone boulders weighing not less than 35 kg each at specified bridge locations. | cum | 100.00 | 914.75 | 91,475 |
| 26 | Providing and laying Pitching with Stone Boulders, weighing not less than 35kg each with voids filled with cement sand mortar 1:4 on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). Rate is excluding cost of cement which shall be paid extra under relevant item. | cum | 200.00 | 2,369.16 | 4,73,832 |
| 27 | Providing and laying Filter Material as per RDSO Specifications underneath pitching in slopes complete as per drawing and Technical Specification. | cum | 150.00 | 2,737.41 | 4,10,611.5 |
| 28 | Providing and laying 300mm thick (average) Dry Stone flooring with boulders of not less than 35kg each in weight, hand packed with surface levelled off to the correct section with hammer dressing as necessary on the ground including filling the gaps with quarry spalls and ordinary sand complete including cost of supply of all materials, labour, lead, lift, tools, plants, crossing of tracks and the like as per drawing and technical specification as directed by Engineer in charge. | cum | 100.00 | 1,876.64 | 1,87,664 |
| 29 | Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines. | cum | 400.00 | 2,242.92 | 8,97,168 |
| 30 | Providing cast in-situ plaques for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. | Each | 2.00 | 1,351.29 | 2,702.58 |
| 31 | Supplying, spreading and filling coarse sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant. | cum | 150.00 | 1,113.65 | 1,67,047.5 |
| 32 | Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. | cum | 220.00 | 387.52 | 85,254.4 |
| 33 | Bridge Tablet | Each | 2.00 | 41.71 | 83.42 |
| 34 | HFL, FSL & DL on Bridge Pier / Abutment | Each | 6.00 | 629.89 | 3,779.34 |
| 35 | Fabrication, supplying and fixing 600mm x 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded in ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately. | Each | 2.00 | 3,336.1 | 6,672.2 |
| Schedule total | ₹4,58,60,462.69 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EPCDrawings.pdf
ATTACHMENT
RFPforSini-Kandra.pdf
ATTACHMENT
BidDocumentforSini-Kandra.pdf
ATTACHMENT
EPCContractSafetyandSecurity.pdf EPC Contract Safety and Security
ATTACHMENT
Drawings.pdf
ATTACHMENT
EPCContractSafetyandSecurity.pdf
ATTACHMENT
AddendumandCorrigendumNo3.pdf
CORRIGENDUM
AddendumandCorrigendumNo2.pdf
CORRIGENDUM
EPCDrawingspartVI.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .