Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | single₹18.0 CrAccepted-AOC NO 888 TVS TOLLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | ₹18.0 Cr Quoted ₹19.2 Cr | single | Accepted-AOC Single bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | PCV Enterprises L1 |
|---|---|---|---|---|
| 1.00Conveying 3.00 MLD Secondary Treated Effluent Water (STEW) from Perambalur Municipality STP to M/s MRF Pvt. Ltd., Plant at Naranamangalam village in Perambalur District as full Deposit work (Period of Construction: 12 months, Trial run: 3 Months & Paid Maintenance : 24 Months) | ||||
| 1.01 | Pumping Main - Materials | 1 | Job | 13,08,31,753.9 ₹13.1 Cr |
| 1.02 | Pumping Main - Civil | 1 | Job | 1,48,51,449.7 ₹1.5 Cr |
| 1.03 | Construction of Pipe carrying Bridge along the Pumping main - | 1 | Job | 44,23,670.9 ₹44.2 L |
| 1.04 | Construction of 3.90 LL CAPACITY - SIPCOT SUMP CUM PUMP HOUSE @ PUTHUR | 1 | Job | 45,49,494.02 ₹45.5 L |
| 1.05 | Construction of Pump Room - 4 m x 3 m | 1 | Job | 4,59,442.42 ₹4.6 L |
| 1.06 | HSC PUMPSET FOR PROPOSED SUMP | 1 | Job | 50,76,919.04 ₹50.8 L |
| 1.07 | Operation and Paid Maintenance of the Scheme for Two years | 1 | Job | 24,65,827 ₹24.7 L |
| 2.00Sub Total | ||||
| 3.00 | GST in 18% | 1 | GST | 2,92,78,540.26 ₹2.9 Cr |
Tender Value
₹17.5 Cr
EMD Value
₹13.1 L
Closing Date
7 Mar 2025, 3:00 pmClosed
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
Conveying 3 MLD STEW from Perambalur MPTY STP to MRF Pvt Ltd
2025_TWAD_524466_1
13 F. WSS to MRF Perambalur SDO CE TNJ 2024 Dated.31.01.2025
Open Tender
Civil Works
Office of the Chief Engineer, TWAD Board
As Per Bid Document
3 documents required · 3 mandatory
₹0
₹13.1 L
Office of the Chief Engineer, TWAD Board Thanjavur
6 Oct 2025
12 Feb 2025
10 Mar 2025
12 Feb 2025
7 Mar 2025
21 Feb 2025
12 Feb 2025 - 20 Feb 2025
20 Feb 2025
Amount
Conveying 3.00 MLD Secondary Treated Effluent Water (STEW) from Perambalur Municipality STP to M/s MRF Pvt. Ltd., Plant at Naranamangalam village in Perambalur District as full Deposit work (Period of Construction: 12 months, Trial run: 3 Months & Paid Maintenance : 24 Months)
Pumping Main - Materials
Pumping Main - Civil
Construction of Pipe carrying Bridge along the Pumping main -
Construction of 3.90 LL CAPACITY - SIPCOT SUMP CUM PUMP HOUSE @ PUTHUR
Construction of Pump Room - 4 m x 3 m
HSC PUMPSET FOR PROPOSED SUMP
Operation and Paid Maintenance of the Scheme for Two years
Sub Total
GST in 18%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 3.46 MB
Tenderdocument.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid