Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | single₹18.0 CrAccepted-AOC NO 888 TVS TOLLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | single | Accepted-AOC Single bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | PCV Enterprises L1 |
|---|---|---|---|---|
| 1.00Conveying 3.00 MLD Secondary Treated Effluent Water (STEW) from Perambalur Municipality STP to M/s MRF Pvt. Ltd., Plant at Naranamangalam village in Perambalur District as full Deposit work (Period of Construction: 12 months, Trial run: 3 Months & Paid Maintenance : 24 Months) | ||||
| 1.01 | Pumping Main - Materials | 1 | Job | 13,08,31,753.9 ₹13,08,31,753.9 Lowest |
| 1.02 | Pumping Main - Civil | 1 | Job | 1,48,51,449.7 ₹1,48,51,449.7 Lowest |
| 1.03 | Construction of Pipe carrying Bridge along the Pumping main - | 1 | Job | 44,23,670.9 ₹44,23,670.9 Lowest |
| 1.04 | Construction of 3.90 LL CAPACITY - SIPCOT SUMP CUM PUMP HOUSE @ PUTHUR | 1 | Job | 45,49,494.02 ₹45,49,494.02 Lowest |
| 1.05 | Construction of Pump Room - 4 m x 3 m | 1 | Job | 4,59,442.42 ₹4,59,442.42 Lowest |
| 1.06 | HSC PUMPSET FOR PROPOSED SUMP | 1 | Job | 50,76,919.04 ₹50,76,919.04 Lowest |
| 1.07 | Operation and Paid Maintenance of the Scheme for Two years | 1 | Job | 24,65,827 ₹24,65,827 Lowest |
| 2.00Sub Total | ||||
| 3.00 | GST in 18% | 1 | GST | 2,92,78,540.26 ₹2,92,78,540.26 Lowest |
Tender Value
₹17.5 Cr
EMD Value
₹13.1 L
Closing Date
7 Mar 2025, 3:00 pmClosed
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
Conveying 3 MLD STEW from Perambalur MPTY STP to MRF Pvt Ltd
2025_TWAD_524466_1
13 F. WSS to MRF Perambalur SDO CE TNJ 2024 Dated.31.01.2025
Open Tender
Civil Works
Turn-key
Office of the Chief Engineer, TWAD Board
As Per Bid Document
3 documents required · 3 mandatory
₹0
₹13.1 L
Office of the Chief Engineer, TWAD Board Thanjavur
6 Oct 2025
12 Feb 2025
10 Mar 2025
12 Feb 2025
7 Mar 2025
21 Feb 2025
12 Feb 2025 - 20 Feb 2025
20 Feb 2025
Amount
Conveying 3.00 MLD Secondary Treated Effluent Water (STEW) from Perambalur Municipality STP to M/s MRF Pvt. Ltd., Plant at Naranamangalam village in Perambalur District as full Deposit work (Period of Construction: 12 months, Trial run: 3 Months & Paid Maintenance : 24 Months)
Pumping Main - Materials
Pumping Main - Civil
Construction of Pipe carrying Bridge along the Pumping main -
Construction of 3.90 LL CAPACITY - SIPCOT SUMP CUM PUMP HOUSE @ PUTHUR
Construction of Pump Room - 4 m x 3 m
HSC PUMPSET FOR PROPOSED SUMP
Operation and Paid Maintenance of the Scheme for Two years
Sub Total
GST in 18%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 3.46 MB
Tenderdocument.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .