| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC RAM NAGAR NEW BUS STAND NARWANA 126116 | NARWANA | JIND | HARYANA | 126116 | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 Cr+₹3.5 L (1.82%)Rejected-AOC NA VILLAGE SUDKAIN KALAN DISTT JIND 125116 | SUDKAIN KALAN | JIND | HARYANA | 125116 | ₹1.9 Cr+₹3.5 L (1.82%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.0 Cr+₹7.8 L (4.07%)Rejected-Finance HOUSE NO 399 NEAR UNION BANK BARWALA 125121 | HISAR | HARYANA | 125121 | ₹2.0 Cr+₹7.8 L (4.07%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.1 Cr+₹15.4 L (8.08%)Rejected-Finance HOUSE NO 2067 SECTOR 2 3 DISTT ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | ₹2.1 Cr+₹15.4 L (8.08%) | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical FARIDABAD FARIDABAD HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Others-SIMILAR NATURE WORK EXPERIENCE NOT PROVIDED |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
23 Nov 2022, 5:00 pmClosed
AJAY SINGH KUNDU
Const. Divn. No. 28, Jind
above said bridge is in very damage condition and narrow passage so remodeling is required
2022_HRY_245305_1
2022BF269012 F6DF 4606 93C4 393C5B45A002369IRR
Open Tender
Civil Works
Works
240 days
RAMKALI
3 documents required · 3 mandatory
₹15,000
Yes
₹4.1 L
Yes
Const. Division no. 28 Jind
14 Mar 2023
10 Nov 2022
24 Nov 2022
10 Nov 2022
23 Nov 2022
10 Nov 2022
10 Nov 2022 - 23 Nov 2022
17 Nov 2022
Amount
[11.4.2]10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) Through Rate
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) Through Rate
[13.27]Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Through Rate
[15.6.1]Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORTandH clause 1300 1. Cement Mortar 1:3 (1 cement : 3 sand) Through Rate
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. Through Rate
[2.B0979] B0979. MS plates, angles, channels etc. i/c fabrication Rate
[27.10.1.2]RCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump Through Rate
[27.16.2]Back filling behind abutment, wing wall and return wall complete as per drawing and MoRTandH Specification 710.1.4 of IRC: 78 and 2200. 2. Sandy material Through Rate
[27.26.1.1]RCC M-20, Using Batching Plant, Transit Mixer and Concrete Pump 1.1. For solid slab super-structure, 20-30 per cent of labour, material and machinery cost Height up to 5m Through Rate Applied Note: The rates of all the RCC items include the cost of Form Work /Centering and Shuttering etc.
[27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200. PCC Grade M15 (with concrete Mixer) Height up to 5m Through Rate
[27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. Through Rate
[34.4.1]Cautionary sign board 900x900x900mm triangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports including three year outdoor weathering test report for sheeting tested in India condition from an independent test laboratory conforming to clause 6.7 of IRC 67-2012 1. Using retro reflective Sheeting Class C as per IRC 67 2012 Through Rate
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. Through Rate
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Through Rate
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) Through Rate
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Through Rate
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar Through Rate
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 3. Cold twisted bars Through Rate
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) Through Rate
Credit for RS Joist
CREDIT OF DISMANTEELED BRICK
Credit of old steel as per market rate
This item is required for the credit rate of steel item that is required for sight for Diversion in bridges cases.
JOGINDER SINGH CONTRACTOR
M/s Bishan Parkash and Company
M/S Kaliraman Construction Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .