Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹87,761.20Admitted-Finance | -9.90% | ₹87,761.20 | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-as per nit condition tender id name of work should be written on cdr |
Tender Value
₹96,000
EMD Value
₹1,920
Closing Date
11 Sept 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_323299_29
e-Nit 44 of REW Ramban(2nd call)
Open Tender
Civil Works
Percentage
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹1,920
Yes
17 Sept 2026
4 Sept 2026
12 Sept 2026
4 Sept 2026
11 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 3 | cum | 592.9 | ₹1,778.7 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m- in width as well as10 sqm on plan including disposal of excavated earth. lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil in surface . | 7 | Sqm | 91.75 | ₹642.25 |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses,parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size. | 3.6 | cum | 7,564.8 | ₹27,233.28 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 0.95 | Sqm | 286.35 | ₹272.03 |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) | 3.12 | cum | 5,402.9 | ₹16,857.05 |
| 6 | Dry Random Rubble Stone Masonry For plinth and Foundation without Bond with Nallah Stone. | 7.8 | cum | 2,793.8 | ₹21,791.64 |
| 7 | Carriage of Cement | 1.11 | cum | 651.05 | ₹722.67 |
| 8 | Carriage of Sand | 2.84 | cum | 2,151.52 | ₹6,110.32 |
| 9 | Carriage of Aggregates | 3.69 | cum | 1,102.71 | ₹4,069 |
| 10 | Carriage of Stones | 11.23 | cum | 1,418.28 | ₹15,927.28 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_1088512.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .