Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.6 LAccepted-AOC PASCHIM BHAGABANPORE DARUA CONTAI PURBA MEDINIPUR 721401 | PURBA MEDINIPUR | PURBA MEDINIPUR | WEST BENGAL | 721401 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹1.2 Cr+₹19.2 L (19.3%)Rejected-Finance DOOR NO 10 38 21 A RAMNAGAR VISAKHAPATNAM 530 002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L2 | Rejected-Finance Not Being Lowest | |
| 3 | L3₹1.2 Cr+₹19.2 L (19.3%)Rejected-Finance D NO 10 36 3 2 FLAT NO N 1 DASARATHA ENCLAVE RAM NAGAR VISAKHAPATNAM 530 002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L3 | Rejected-Finance Not Being Lowest | |
| 4 | L4₹1.3 Cr+₹27.4 L (27.5%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L4 | Rejected-Finance Not Being Lowest | |
| 5 | L5₹1.4 Cr+₹40.0 L (40.2%)Rejected-Finance SRIKONA POTAPOLA CHHAKA CHANDIPUR ROAD BALASORE ODISHA 756025 | BALASORE | BALESHWAR | ODISHA | 756025 | L5 | Rejected-Finance Not Being Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
2 Jan 2025, 6:00 pmClosed
GARRISON ENGINEER
GE (I) R and D Chandipur, Post-Chandipur, PIN-756025
PROVN OF RECD FOR REDUCTION OF DG EMISSION AS PER CPCB NORMS TO 400 KVA DG SETS AT ITR TECH AREA 250 KVA AND 380 KVA DG SETS AT LAUNCH COMPLEXES. 125 KVA 100 KVA 82.5 KVA AND 62.5 KVA DG SETS AT TELEMETRY SITE A AND B CHANDIPUR AND 250 KVA, 82.5 KVA
2024_MES_682707_1
8946/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE I R AND D CHANDIPUR
As per Tender Documents
8 documents required · 8 mandatory
₹1,000
GE I R AND D Chandipur
₹2.3 L
Yes
28 Jan 2025
6 Nov 2024
4 Jan 2025
6 Nov 2024
2 Jan 2025
26 Dec 2024
Amount
NOTE (Applicable for all items) :- The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. SCHEDULE 'A'
Supply, install, testing and commissioning of Certificate of Type approval for Retrofit Emission Control Device (RECD) and Conformity of Production (COP) Certificate COP issued by Certification Agency as per CPCB guidelines for the period (1st July to 30 th Jun of subsequent year), suitable for exiisting DG Sets of capacity 400 KVA to reduce emmission level as per CPCB-II norms with following requirements as given under Srl No 1.02 to 1.05 below:-
Technical specification :- (i) Type of emission device (working principle of the PM reduction active element) : Output result of the RECD should be as per CPCB-II norms irrespective of the manufacturer's technology (ii) Emmission limits as per CPCB-II norms : PM 2.5 ≤0.2 g/kW-hr, Nox + HC ≤4.0 g/kW-hr, CO≤3.5g/kW-hr, Smoke Limit (Light Absorption Co-efficient ≤0.7 m-1 (iii) Praticulate Matter capturing efficiency : Greater than 70% (iv) Back pressure on engine : No back pressure from RECD to Engine Exhaust system (v) Material of consturction : as approved by CPCB Lab (vi) Emission monitoring from stack shall be tested from any NABL approved Lab (vii) Insulation on emission device : as approved by CPCB Lab (viii) RECD's power requirement : less than 1% of the capacity used for operation (ix) Foundation or installation structure as required and necessary electrical connection are deemed to be included in the quoted rate
(x) Supply of 200 mm MS B-Class exhaust piping with insulation and aluminum sheet cladding on MS supports for extension to existing exhaust piping with bellows /connectors as required as required for the works. (xi) Electric control panel with necessary wiring and all its accessories for smooth of DG with RECD system (xii) Support provided by OEM : Pre supply and inspection, Installation feasibility study at site, Health check-up of existing DG, Type Approved RECD with complete Solution, Educating Dept Staff on usage and operation and maintenance procedure. (xiii) Installtion and commissioning of RECD by authrised and approved OEM only
Scope of work : (i) Emission control system with PRV, Inlet & outlet pipe, Structure with removable ladder and Electric panel with all accessories. (ii) Performance / Characteristic curves at rated load - Under vendor scope (iii) The output result of RECD shall be as per CPCB-II norms, irrespective of the manufacturer's technology (vi) Secondary emission : Bidder shall submit the declaration that there is no secondary emission (v) Noise emission : No increase in noise level after installation of retrofit device (vi) No by-pass arrangement in RECD allowed to let the pollutants in open environment (vii) Testing - Genset shall be tested on all load pattern available at site during post RECD installation (viii) Warranty in all respect of 02 years post completion of work is applicable in RECD installation (ix) Contractor shall furnish manufacturer's written instruction and requirement about use and maintenance of RECD system, its operation and maintenance schedule.
Notes :-(i) Retro-fit emission control system should be as per Statutory Authorities recommendations to achieve minimum specified particulate matter capturing efficiency of at least 70%. The emission control system shall be type tested and approved from CPCB approved laboratories as per guideline of NGT and MoHUA. (ii) Retro-Fit emission control system of suitable rating or sizes shall be installed or retrofitted in existing exhaust pipe with required modifications and suitable design compatible for respective model of diesel engine prime mover of DG sets and have safety precautions to ensure no damage to the engine operations under any circumstances (iii) Safety system provided to engine from higher back pressure, engine vibration, and high temperature operations to avoid any malfunction, it should be within the limits as recommended by DG OEM. The retrofit system manufacturer to coordinate and submit certificate from DG OEM.Cost for the same is deemed to be included in the quoted cost. (iv) The emission reduction will be verified after the installation of unit at site by any of the air pollution labs approved by CPCB.Contractor will submit the necessary certficate.Cost for the same is deemed to be included in the quoted cost.(v) The unit quoted cost includes all necessery RCC civil foundation/MS structure for installation of RECD structures as per recommendation of Manufacturer and as directed by GE. (vi) Make of existing DG set -Kirloskar Oil Engine Ltd/Greaves
All as per item No. 1.01 above but for capacity 380 KVA DG Set Note- Make of existing DG set -Kirloskar Oil Engine Ltd
All as per item No. 1.01 above but for capacity 250 KVA DG Set Note- Make of existing DG set -Greaves/Kirloskar Oil Engine Ltd
All as per item No. 1.01 above but for capacity 125 KVA DG Set Note- Make of existing DG set -Greaves
All as per item No. 1.01 above but for capacity 100 KVA DG Set Note- Make of existing DG set -Greaves
All as per item No. 1.01 above but for capacity 82.5 KVA DG Set Note- Make of existing DG set -Kirloskar Oil Engine Ltd
All as per item No. 1.01 above but for capacity 62.5 KVA DG Set and Emission limits as per CPCB-II norms : PM 2.5 < 0.3g/kW-hr, CO < 3.5 g/KW-hr, Nox+HC < 4.7 g/kW-hr Note- Make of existing DG set -Kirloskar Oil Engine Ltd
M/s Saptagiri constructions (BID ID -3204616)
eldi techs (BID ID -3204725)
GEPS PROJECTS (BID ID -3204540)
bholanath bera (BID ID -3201431)
Bidder Name
GEPS PROJECTS
M/s Saptagiri constructions
RANA ENTERPRISES
eldi techs
bholanath bera
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .