| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 CrAccepted-AOC HOUSE NO 59 ZOO NARENGI ROAD GEETANAGAR GUWAHATI 781021 ASSAM | KAMRUP METRO | ASSAM | 781021 | L1 | Accepted-AOC Accepted by BEC |
| Sl No | Description | Qty | Unit | Shivam transcon Pvt.Ltd L1 |
|---|---|---|---|---|
| 1.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 300 mm to 600 mm | 64 | no. | 400 ₹25,600 Lowest |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 600 mm to 900 mm | 30 | no. | 900 ₹27,000 Lowest |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 900 mm to 1800 mm | 12 | no. | 1,300 ₹15,600 Lowest |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 1800 mm to 2700 mm | 2 | no. | 2,600 ₹5,200 Lowest |
| 5.00 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means, Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 4,837.5 | no. | 15 ₹72,562.5 Lowest |
| 6.00 | Clearing and grubbing road land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm thickness.
By Mechanical Means
In area of light jungle | 1.67 | Hac | 1,20,000 ₹2,00,163.6 Lowest |
| 7.00 | Compacting Original Ground
Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 6,295.65 | cum | 80 ₹5,03,652 Lowest |
| 8.00 | Compacting Original Ground
Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 4,186.29 | cum | 125 ₹5,23,286.25 Lowest |
| 9.00 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres) | 6,542.4 | cum | 140 ₹9,15,936 Lowest |
| 10.00 | Excavation in Marshy Soil
(Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 1,635.6 | cum | 140 ₹2,28,984 Lowest |
Tender Value
₹49.5 Cr
EMD Value
₹99.1 L
Closing Date
29 Jun 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE PWD(Boarder Roads and NEC Works) ASSAM
O/O CE PWD(Border ROADS) ASSAM, Chandmari Ghy-3
Dibrugarh/CRIF/2023-24/01 Construction of RCC Bridge over River Buridehing at Aghunibari to Telpani including Approaches and protection work in Tingkhong LAC Bridge Length 300.00m (5x60.00m)
2024_PWD_37620_1
Dibrugarh/CRIF/2023-24/01
Open Tender
Civil Works – Roads
Item Rate
730 days
Dibrugarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹99.1 L
Yes
O/o the CE,Border Roads,PWD Assam,chandmari
12 Dec 2024
15 Jun 2024
1 Jul 2024
15 Jun 2024
29 Jun 2024
15 Jun 2024
15 Jun 2024 - 29 Jun 2024
19 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 300 mm to 600 mm | 64 | no. | 362.95 | ₹23,228.8 |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 600 mm to 900 mm | 30 | no. | 723.52 | ₹21,705.6 |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 900 mm to 1800 mm | 12 | no. | 1,297.1 | ₹15,565.2 |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 1800 mm to 2700 mm | 2 | no. | 2,365.72 | ₹4,731.44 |
| 5 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means, Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 4,837.5 | no. | 10.71 | ₹51,809.62 |
| 6 | Clearing and grubbing road land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm thickness.
By Mechanical Means
In area of light jungle | 1.67 | Hac | 43,095.85 | ₹71,885.17 |
| 7 | Compacting Original Ground
Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 6,295.65 | cum | 71.4 | ₹4,49,509.41 |
| 8 | Compacting Original Ground
Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 4,186.29 | cum | 113.05 | ₹4,73,260.08 |
| 9 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres) | 6,542.4 | cum | 123.76 | ₹8,09,687.42 |
| 10 | Excavation in Marshy Soil
(Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 1,635.6 | cum | 133.28 | ₹2,17,992.77 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_61211.xls
BOQ • 0.29 MB
146318967.pdf
Tender Documents • 4.66 MB
146318968.pdf
Tender Documents • 0.30 MB
146318970.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .