Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
7 Aug 2026, 11:00 am
HAS-MAJN Sec: Elimination of unmanned LC No. 78 at km.119/600-700 by diverting road traffic through ROB No. 444
24MYS26of15-07-26itno01
24MYS26of15-07-26itno01
Open
Works - General
6 Months
Unknown (Unspecified Location)
₹0
₹3.9 L
15 Jul 2026
15 Jul 2026
24 Jul 2026
A-List of items that are covered under DSR
A-List of items that are covered under USSOR
B-List of items that are not covered under DSR/USSOR
A2-List of items that are covered under DSR
Item Breakup - A-List of items that are covered under DSR
Item Breakup - A-List of items that are covered under USSOR
cum Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in- Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
3150.00 except rock
75.00 bed for protection against scour with stone boulders weighing not less than 35 kg each with voids filled with spalls complete as per drawing and Technical Specification.
95.00 than 35 kg each at specified bridge locations.
108.00 Boulders, weighing not less than 35kg each with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
72.00 RDSO Specifications underneath pitching in slopes complete as per drawing and Technical Specification.
93.00 return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. Total 3823044.27
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Correction slip to GCC 2022
ATTACHMENT
ACS-4toGCC-2022.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo8.pdf Correction Slip No 8 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo5.pdf Correction Slip No 5 to GCC 2022
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo6.pdf Correction Slip No 6 to GCC 2022
ATTACHMENT
GCCACSCORRECTION.pdf
ATTACHMENT
ACS-3toGCC-2022.pdf
ATTACHMENT
JPOforcablecut.pdf
ATTACHMENT
Proforma161718.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo9.pdf Correction Slip No 9 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo7.pdf Correction Slip No 7 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo10.pdf Correction Slip No 10 to GCC 2022
ATTACHMENT
LC78.pdf
ATTACHMENT
LCNo78.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo5.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo6.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo9.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo7.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo10.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo8.pdf
ATTACHMENT
Download all tender documents and submit your bid