Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹17,680
Closing Date
22 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer
KDA
Construction of Ornamental Entry Gate at Rakna Ziyarat Palmar.
2021_Tourm_144058_1
-NIT No. 09 of 2021-22
Open Tender
Civil Works
Item Wise
30 days
Kishtwar
Construction of Ornamental Entry Gate at Rakna Ziyarat Palmar.
3 documents required · 3 mandatory
₹500
Yes
CEO
₹17,680
23 Oct 2021
16 Oct 2021
22 Oct 2021
16 Oct 2021
22 Oct 2021
16 Oct 2021
120 days
Amount
Earth work in excavation by manual Means overarea (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth up to 1 mtr from cutting edge,disposed earth to be levelled and neatly dressed in all kind of soil including all lead and lift.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work up to plinth level 1:4:8 (1: cement :4 coarse sand:8 graded stone aggregate 40 mm nominal size. Nallah including all lead and lift.
Reinforced cement concrete work in wall (any thickness) including attached pilasters butresses, plinth and string courses, fillets, columns, pillers etc up to floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 ( (1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size ) crushed including all lead and lift.
Reinforcement for RCC work including straightning, cutting, banding and placing in position and binding all complete job(TMT including all lead and lift).
Stone work in plain ashler in super structure up to floor five level in cement mortor 1:6 (1: cement :6 coarse sand)including pointing with cement mortor 1:2 ( 1: cement :2 coarse Sand)with admixture of pigment matching the stone shade in Deori stone brought from Sringar fine chisled by experienced chislers in particular locality of srinagar (Viz Athwajan) both faces dressed including all lead and lift.
Stone work senk or moulded moulding corners etc as already work executed at Chowgan Gate brought from srinagar as approved by Engineer in Charge including all lead and lift.
Centring and shuttering including strutting propping, etc and removal of forms work, Arches, domes up to 6 m span including all lead and lift
Structural steel work in single section fixed with out connection plate including cutting hositing fixing in position for gate and applying a priming coat red oxide ofapproved steel primer all complete including all lead and lift
Painting with readymixed synthetic enemal paint of approved brand and manufaucture in all shade to given an even shade new steel work (two or more coats ) including all lead and lift.
RR masonary with hard stone from nallah in foundation and plinth including levelling up with cement concrente 1:6:12 (1: cement :6 coarse sand :12 stone aggragate at plinth level with cement mortor 1:6 (1: cement :6 fine sand ) including all lead and lift.
RIYAZ AHMED MALIK
Javeed Iqbal Ahanger
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .