| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | -28.78% | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | -21.10% | ₹6.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | -16.50% | ₹6.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.4 LAdmitted-Fee/PreQual/Technical/Finance | -8.00% | ₹7.4 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
17 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
Hall No. 4 Executive Engineer REW Kishtwar
BOQ
2026_RDPR_318344_50
e-NIT No 62 of REW KISHTWAR 2026-27 Dated.28.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
Please refer tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer REW Kishtwar
₹16,000
22 Aug 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavaticm in trenches for foundation, drain. pipes, cables etc and for shafts. wells. Cesspits and the like not exceeding
10 sqm on plan, depth upto 1.5 m including disposal of excavated earth in: AKOS | 1 | CUM | - | - |
| 2 | providing and laying in position Cement Concrete Of Specified grade including curing but excluding t COSt Of centring and Shuttering.All work upto plinth level with: (I cement : 4 coarse sand g graded stone aggregate 40 mm nominal size | 1 | CUM | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering.All work upto plinth level With: 1:36 (I cement : 3 coarse sand : 6 graded Stone aggregate 20 mm nominal Size) Plumb | - | CUM | - | - |
| 4 | Providing and laying in position specified grade Of reinforced cement concrete including curing but excluding the Cost Of centering.shutterinb nnishing and reinforcement. All works upto plinth level (l cement : 2 coarse sand 4 graded Stone aggregate 20 mm
nominal size) | - | CUM | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters. buttresses. plinth and String courses. fillets,columns, pillars, piers. abutments. and Struts upto floor ave level including curing but excluding cost shuttering finishing and reinforcement I (l Cement : h coarse sand 3 graded stone aggregate 20 mm nominal size). | 1 | CUM | - | - |
| 6 | Centering and Shuttering including Strutting propping etc, and removal Of form work for: Foundations. footings, bases for columns | - | Sqm | - | - |
| 7 | Centering and Shuttering including Strutting propping etc, and removal Of form work for: (b)Suspended roofs, landings.balconies and access platforms, | 1 | Sqm | - | - |
| 8 | Steel reinforcement for work including Straightening Cutting. bending. placing in position and binding all complete upto plinth level Mild Steel and medium tensile Steel bars | - | kg | 1 | - |
| 13 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) | 1 | Sqm | - | - |
| 14 | 6 mm cement plasterto ceilingofmixl ; 3 (1 cement: 3 fine sand) | - | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_1053417.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].