Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹22.3 LAdmitted-Finance | ₹22.3 L | Admitted-Finance |
| 2 | ₹24.2 LAdmitted-Finance | ₹24.2 L | Admitted-Finance |
| 3 | ₹25.1 LAdmitted-Finance | ₹25.1 L | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHUBHAM CENTRE | M/S MAITRA ENTERPRISE | M/S. DIMAPUR STEEL FACTORY |
|---|---|---|---|---|---|---|
| 1.00 | Daily maintenance and operation of the water pumping and treatment plants with one operator cum technician (Skilled) in each shift of three shift for each installation from 0600 hrs to next day 0600hrs (in three shifts per day consisting of 08 hrs per shift ) including sunday and holiday as specified and directed by the Engineer-in-Charge (Note: term daily operation includes minor maintenance and like adjustment of eqpt, cleaning , insert gland packing and also hourly ready and recording of each plant, log sheet will be maintained by the contractor in standard performa to make record in consultation with Engr-in-charge and periodical maint includes back washing of pressure filter/IRP daily or as required including maint of pumping sets (centrifugal/monoblock) like replacement of gland packing , bearing etc replacement of pumping set . Feeding of chemical bleeching and alum etc as per direction of Engr, cleaning of aieration tank storage sump and overhead storage tank as required at treatment & distribution/supply pump house, Contractor shall ensure availability and use of all safety equipments needed during work. The contractor shall solely be responsible for any accident due to non adoption of proper security measures or due to breach of safety norms. | 1,002 | Shifts | 12,12,420 ₹12.1 L | 10,32,060 ₹10.3 L | 12,52,500 ₹12.5 L |
| 2.00 | Daily maintenance and operation of the DG sets, switch gears and other electrical (Highly skilled) eqpts at pump house and Generator room with one operator in each shift of three shift for each installation from 0600hrs to next day 0600hrs (in three shifts per day consisting of 08 hrs per shift) including sunday and holiday to keep continuous electric supply and repolacement of all defective spare parts as specified and directed by the Engr-in-Charge) Note : Term daily operation includes minor maintenance and like adjustment of eqpt, cleaning of batteries terminals, self dynamo and also hpourly reading and recording of each plant including servicing minor with replacement of log sheet will be maintained by the contractor in standard performa to make records in consultation with Engr-in-Charge (ii) Fuel for lubricants will be issued under Sch 'B" store free for feeding as required. Spares will be measured and paid separetely under appropriate items (iii) Contractor shall ensure availability and use of all safety equipments needed during work. The contractor shall solely be responsible for any accident due to non adoption of proper security measures or due to breach of safety norms. | 1,002 | Shifts | 12,12,420 ₹12.1 L | 12,02,400 ₹12.0 L | 12,52,500 ₹12.5 L |
Tender Value
₹22.3 L
EMD Value
₹45,000
Closing Date
1 Dec 2025, 10:00 amClosed
SO-1(Wks)
SO-I (Wks) ARTC and School Shokhuvi
Manning and Operation of EM installations and eqpt at ARTCS, Dimapur (Nagaland)
2025_ARMHA_885214_1
28028/ARTCS/NIT/2025-26/50
Open Tender
Coal Works
330 days
Dimapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Commandant, ARTC and School
₹45,000
28 Feb 2026
12 Nov 2025
2 Dec 2025
12 Nov 2025
1 Dec 2025
12 Nov 2025
12 Nov 2025 - 30 Nov 2025
Daily maintenance and operation of the water pumping and treatment plants with one operator cum technician (Skilled) in each shift of three shift for each installation from 0600 hrs to next day 0600hrs (in three shifts per day consisting of 08 hrs per shift ) including sunday and holiday as specified and directed by the Engineer-in-Charge (Note: term daily operation includes minor maintenance and like adjustment of eqpt, cleaning , insert gland packing and also hourly ready and recording of each plant, log sheet will be maintained by the contractor in standard performa to make record in consultation with Engr-in-charge and periodical maint includes back washing of pressure filter/IRP daily or as required including maint of pumping sets (centrifugal/monoblock) like replacement of gland packing , bearing etc replacement of pumping set . Feeding of chemical bleeching and alum etc as per direction of Engr, cleaning of aieration tank storage sump and overhead storage tank as required at treatment & distribution/supply pump house, Contractor shall ensure availability and use of all safety equipments needed during work. The contractor shall solely be responsible for any accident due to non adoption of proper security measures or due to breach of safety norms.
Daily maintenance and operation of the DG sets, switch gears and other electrical (Highly skilled) eqpts at pump house and Generator room with one operator in each shift of three shift for each installation from 0600hrs to next day 0600hrs (in three shifts per day consisting of 08 hrs per shift) including sunday and holiday to keep continuous electric supply and repolacement of all defective spare parts as specified and directed by the Engr-in-Charge) Note : Term daily operation includes minor maintenance and like adjustment of eqpt, cleaning of batteries terminals, self dynamo and also hpourly reading and recording of each plant including servicing minor with replacement of log sheet will be maintained by the contractor in standard performa to make records in consultation with Engr-in-Charge (ii) Fuel for lubricants will be issued under Sch 'B" store free for feeding as required. Spares will be measured and paid separetely under appropriate items (iii) Contractor shall ensure availability and use of all safety equipments needed during work. The contractor shall solely be responsible for any accident due to non adoption of proper security measures or due to breach of safety norms.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_930538.xls
BOQ • 6.67 MB
Download all tender documents and submit your bid