Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹30.2 LAccepted-AOC | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE QUALIFIED BIDDER |
| Sl No | Description | Qty | Unit | MAGADH ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: OTR Tyre related works (Dismantling, Assembling, Demounting, Mounting, Inflation and daily checking) of all type of wheel mounted HEMMs like Dumpers, Graders, Cranes, Payloaders, Tyre Handler, Water Sprinklers, Wheel Dozer etc for the periods of 730 days. Note: All required Tools and Tackles including manual and pneumatic torque wrench, cotton waste etc. will be provided by the firm. | ||||
| 1.10 | Labour charges for Dismantling of Tyres including contractor's profit.
Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres. | 650 | Nos. | 470 ₹3,05,500 Lowest |
| 1.20 | Labour charges for Assembling of Tyres including contractor's profit.
Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres. | 650 | Nos. | 470 ₹3,05,500 Lowest |
| 1.30 | Labour charges for Demounting (removal) of Tyres including contractor's profit.
Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres. | 900 | Nos. | 670 ₹6,03,000 Lowest |
| 1.40 | Labour charges for Mounting (fitment) of Tyres including contractor's profit.
Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres. | 900 | Nos. | 670 ₹6,03,000 Lowest |
| 1.50 | Labour charges for Inflation of Tyres & checking of Wheels of Tyre mounted HEMMs including contractor's profit.
Note : It includes a group of 01 No. Semi- Skiled manpower for 02 Shift per day. | 730 | Days | 1,000 ₹7,30,000 Lowest |
| 2.00 | Cost of Medical/Safety items, Tools & Tackles containing manual and pneumatic torgue wrench, cotton waste etc. @ 2.00% on labour charge. | 1 | No. | 15,000 ₹15,000 Lowest |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Tender Value
₹34.0 L
EMD Value
₹42,500
Closing Date
5 Sept 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Offloading OTR tyre related work of wheel mounted HEMMs like Dumpers, Graders, Cranes, Payloaders, Tyre Handler, Water Sprinklers and Wheel Dozer etc as back up Support of workshop of Khadia Project for a period of Two Year 730 days.
2025_NCL_341678_1
KHD/G.M. (Excv)/E-Tender/25-26/ 593
Open Tender
Excavation Department Work
Item Rate
730 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹42,500
8 Dec 2025
18 Aug 2025
6 Sept 2025
18 Aug 2025
5 Sept 2025
19 Aug 2025
18 Aug 2025 - 25 Aug 2025
Amount
Scope of Work/Technical Specifications etc: OTR Tyre related works (Dismantling, Assembling, Demounting, Mounting, Inflation and daily checking) of all type of wheel mounted HEMMs like Dumpers, Graders, Cranes, Payloaders, Tyre Handler, Water Sprinklers, Wheel Dozer etc for the periods of 730 days. Note: All required Tools and Tackles including manual and pneumatic torque wrench, cotton waste etc. will be provided by the firm.
Labour charges for Dismantling of Tyres including contractor's profit. Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres.
Labour charges for Assembling of Tyres including contractor's profit. Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres.
Labour charges for Demounting (removal) of Tyres including contractor's profit. Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres.
Labour charges for Mounting (fitment) of Tyres including contractor's profit. Note : It includes a group of 01 No. Skilled, 01 No. Semi- Skiled and 02 Nos. Un-Skilled Manpower in 01 Shift per day for 01 days for 05 nos. tyres.
Labour charges for Inflation of Tyres & checking of Wheels of Tyre mounted HEMMs including contractor's profit. Note : It includes a group of 01 No. Semi- Skiled manpower for 02 Shift per day.
Cost of Medical/Safety items, Tools & Tackles containing manual and pneumatic torgue wrench, cotton waste etc. @ 2.00% on labour charge.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_354200.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .