Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.4 L+₹348.26 (0.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹2,786
Closing Date
28 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627102059 - CONSTRUCTION OF RAMP WITH RAILING FOR HEALTH AND WELLNESS CENTRE BARAGAM AND AMLAR
2026_RDPR_318515_33
e- NIT No. 75/2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,786
Yes
29 Aug 2026
29 Jul 2026
29 Aug 2026
29 Jul 2026
28 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation trenches of drains not exceeding 1.5m in width in all kinds of soils with normal lead & lift | - | cum | - | - |
| 2 | Providing and laying of stone soling incl carriage complete job | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - |
| 5 | P/F of stainless steel railing made of Hollow Tubes Channels plates etc incld welding, grinding,buffing,polishing & making curvature and filling the same withnecessary accessories and stainless steel dash fasteners bolts etc all complete | - | kg | - | - |
| 6 | P/A 12mm thick plaster in 1:4 mix | 1 | sqm | - | - |
| 7 | Providing & Fixing gang saw cut,mirror polished , premoulded & prepolished machine cut for kitchen plateforms,vanity counters ,window sills & similar locations of required size ,colour & texture laid over 20mm thick base cement morter 1:4 (18mm thick) | 1 | sqm | 1 | ₹1 |
| 8 | Carriage of Sand &St.Agg by MT km 8 | 9.21 | cum | 247.72 | ₹2,281.5 |
| 9 | MP/Fixing of signboard and Photographs (as approved by Engineer in-charge) Unforseen items | 1 | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_1050134.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .