Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -15.51% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹10,479.22 (6.51%)Admitted-Finance | -10.01% | ₹1.7 L+₹10,479.22 (6.51%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹19,053.14 (11.8%)Admitted-Finance | -5.51% | ₹1.8 L+₹19,053.14 (11.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 L+₹23,835.48 (14.8%)Admitted-Finance | -3.00% | ₹1.8 L+₹23,835.48 (14.8%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹1.9 L
EMD Value
₹3,820
Closing Date
6 Apr 2026, 6:00 pmClosed
EXEUCTIVE OFFICER
NAGAR PALIKA ABUROAD
Renovation Works of unpurana rasoi at Manpur Circle
2026_DLB_548067_1
NIRMAN/5547-02
Open Tender
Civil Works
Percentage
ABUROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO, MDRISL
₹3,820
Yes
17 Apr 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : 24.5.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 2Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. Cement mortar 1:4 (1 cement :4 coarse sand) | |||||
| 3Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | |||||
| 429.28 Providing and fixing GI wire gauge of average width of aperture 1.56mm with wire of 0.45mm to existing steel door, window shutter frames with necessary M.S. strip beading 20x3mm with suitable screw at not exceeding 150mm distance etc. complete. | |||||
| 5Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortarm 1:6 (1 cement : 6 fine/ coarse sand) | |||||
| 627.17 P & F 1st quality Vitrified Porcelain Polished tiles on floor, skirting and steps etc.in different sizes (thickness to be specified by manufacture) with water absorption less than 0.08% and conforming to IS 15622 of approved make in all colour and shade, laid with 20 mm thick CM 1 : 4 including grouting the joints with white cement and matching pigment etc complete.27.17.2Size 600 mm X 600 mm | |||||
| 732.50 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 32.50.1 Two or more coats on new work | |||||
| 8Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade 32.36.1 New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm | |||||
stage.html
html • 0.03 MB
technical_977232.pdf
techsummary_977232.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_977232.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .