Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.7 L+₹1.0 L (11.6%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.8 L+₹1.1 L (13.0%)Admitted-Finance 88 1 FLOOR SK ROAD MEERUT UTTAR PRADESH 250002 | MEERUT | UTTAR PRADESH | 250002 | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,498
Closing Date
26 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
Nagar Nigam Gorakhpur
Ward 71 Aryanagar me kurmiyan tola me park v open gym ka nirman karya.
2026_DOLBU_1162263_3
FFC Ward 71 sn 76
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹20,498
3 Nov 2026
19 Oct 2026
27 Oct 2026
19 Oct 2026
26 Oct 2026
19 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. SI No.251a | 9.3 | Cu.M | 120 | ₹1,116 |
| 1.02 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-273) | 2.28 | Cu.M | 4,007 | ₹9,135.96 |
| 1.03 | M-150 Brick Work in 1:4 cement & sand 2.20FM motor in foundation and plinth including supply of all materials & labours tools & plant etc., Required for proper completion of the work | 17.98 | Cu.M | 5,817 | ₹1,04,589.66 |
| 1.04 | 12 mm thick plaster with cement and course sand in 1:4 over brick work minimum thickness no to be less than 1 cm , including supply of all materials labours, tools & Plants etc required for proper completion of the work (S.I-584). | 88.8 | sqm | 159 | ₹14,119.2 |
| 1.05 | Laying C.C in 1:2:4 for top of drain work. with cement, Course Sand 20 mm & Stone Grit including supply of all material and labour etc. | 0.66 | Cu.M | 8,186 | ₹5,402.76 |
| 1.06 | M.S Grill Work gate | 42 | kg | 80.64 | ₹3,386.88 |
| 1.07 | Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete (D.S.R 13.26) | 88.8 | sq.m | 113 | ₹10,034.4 |
| 1.08 | S/L two or more coat applied @ 1.67 ltr/10 sqm over and including base 1 coat of water proofing cement paint applied @ 2.20 kg/10sqm. (13.46.1) | 88.8 | Sq.m | 92 | ₹8,169.6 |
| 1.09 | S/L of asian eanmel paint two coats (Oil points) | 2.25 | sq.m | 69 | ₹155.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.58 MB
BOQ_2264780.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .