| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAccepted-Finance | ₹79.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹82.9 L+₹3.7 L (4.65%)Rejected-Finance | ₹82.9 L+₹3.7 L (4.65%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S Ram Pravesh Singh L2 | M/s N. K. Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 582.13 | cum | 500 ₹2,91,063 | 151.82 ₹88,378.37 Lowest |
| 2.00 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 303.03 | cum | 55.28 ₹16,751.36 Lowest | 55.28 ₹16,751.36 Lowest |
| 3.00 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 70.63 | cum | 589.51 ₹41,636.21 Lowest | 589.51 ₹41,636.21 Lowest |
| 4.00 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. | 342.12 | Sqm | 330.34 ₹1,13,016.42 Lowest | 330.34 ₹1,13,016.42 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to
plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 77.4 | cum | 3,751.64 ₹2,90,365.68 Lowest | 3,751.64 ₹2,90,365.68 Lowest |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing
and reinforcement - All work up to plinth level.1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 89.12 | cum | 5,218 ₹4,65,017.72 Lowest | 5,218 ₹4,65,017.72 Lowest |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets,
columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 18.45 | cum | 6,082.45 ₹1,12,221.2 Lowest | 6,082.45 ₹1,12,221.2 Lowest |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves,
chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost
of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate
20 mm nominal size). | 12.79 | cum | 6,308.87 ₹80,665.21 Lowest | 6,308.87 ₹80,665.21 Lowest |
| 9.00 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing with , cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position (including cariage of bars to work site) all complete as per building specification and direction of E/I. TMT Fe 500( onle valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) | 4.22 | MT | 83,314.02 ₹3,51,843.44 Lowest | 83,314.02 ₹3,51,843.44 Lowest |
| 10.00providing Tor steel reinforcement of 10mm,12mm,16mm. dia bars as per approved design and drawing approved design and drawing with , cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position (including cariage of bars to work site) all complete as per building specification and direction of E/I. | |||||
Tender Value
₹80.0 L
EMD Value
₹1.6 L
Closing Date
19 Mar 2026, 11:00 amClosed
E.E. BCD, Building Division No.-1, Ranchi
E.E. BCD, Building Division No.-1, Ranchi
Renovation and Construction of Campus development of State Pharmacy Institute Bariatu, Ranchi
2026_BCD_111456_1
BCD/Div.No.-1, Ranchi/57/ 2025-26
Open Tender
Civil Works - Buildings
Works
30 days
Ranchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
11 Sept 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 582.13 | cum | - | - |
| 2 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 303.03 | cum | - | - |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 70.63 | cum | - | - |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. | 342.12 | Sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to
plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 77.4 | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing
and reinforcement - All work up to plinth level.1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 89.12 | cum | - | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets,
columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 18.45 | cum | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves,
chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost
of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate
20 mm nominal size). | 12.79 | cum | - | - |
| 9 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing with , cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position (including cariage of bars to work site) all complete as per building specification and direction of E/I. TMT Fe 500( onle valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) | 4.22 | MT | - | - |
| 10 | providing Tor steel reinforcement of 10mm,12mm,16mm. dia bars as per approved design and drawing approved design and drawing with , cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position (including cariage of bars to work site) all complete as per building specification and direction of E/I. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
F-2-57.pdf
Tender Documents • 3.87 MB
BOQ_150511.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .