Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹63.4 LAccepted-AOC | ₹63.4 L | 1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical Scanned copy of completion/ experience certificate from the compitant authority in the name of the bidder is not uploaded |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | MD NAZIUR RAHMAN L1 |
|---|---|---|---|---|
| 1.00RCC | ||||
| 1.01 | Reinforced cement concrete work in walls (any thickness), including attached pilastars, buttresses, plinthnand string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and rainforcement.
1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sourses : 3 graded stone aggregate 20mm nominal size derived from natural souraces) | 84.79 | cum | 10,185.05 ₹8,63,590.39 Lowest |
| 2.01 | Shuttering work
Centering and shuttering including strutting, propping etc. and removal of from for columns, pillars, piers, Abutments, posts and struts | 92.4 | Sqm | 804.25 ₹74,312.7 Lowest |
| 3.01 | Lintels, Beams, Plinth Beams, Girders, Bressumers and cantilivers | 325.32 | Sqm | 608.35 ₹1,97,911.46 Lowest |
| 4.01 | Suspended floors, roofs, landings, balkonies and access platforms | 332.76 | Sqm | 766.55 ₹2,55,077.18 Lowest |
| 5.01 | Suspended floors, roofs, landings, balkonies and access platforms, Waist Slab | 9.22 | Sqm | 532.34 ₹4,910.3 Lowest |
| 6.01 | Stairs, (excluding landings) except spiral-staircases, Stairs | 24.75 | Sqm | 657.75 ₹16,279.31 Lowest |
| 7.01 | BRICK WORK
Half brick masonry with common burnt clary F.P.S. (non modular) bricks of cross designation 705 in superstructure above plinth level up to floor, V level ,(A) 112 mm thick brick wall cement morter 1:4 (1 cement : coarse sand) | 451.22 | Sqm | 1,018.5 ₹4,59,570.12 Lowest |
| 8.01 | PLSTERING
1.5 mm cement plaster on the rough side of single or half brick wall of mix : a) In morter 1:4 (1 cement : 4 fine sand) | 143.2 | Sqm | 339.7 ₹48,644.19 Lowest |
| 9.01 | 12 mm cement plaster of mix : 1:4 (1 cement : 4 fine sand) | 824.19 | Sqm | 294.85 ₹2,43,012.13 Lowest |
Tender Value
₹63.4 L
EMD Value
₹1.3 L
Closing Date
17 Jul 2025, 4:00 pmClosed
The Superintending Engineering PHE North Lakhimpu
O/o the Superintending Engineering PHE North Lakhimpur circle
Construction of office building of the superintending Engineer (PHE) North Lakhimpur Circle and Assistant Executive Engineer (PHE) North Lakhimpur Sub Division under SOPD
2025_PHED_45273_1
SEPH/NL/2025-26/TC-8(PT-2)/299
Open Tender
Civil Works - Building
Item Rate
180 days
O/o Superintending Engineering PHE NL Circle
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,267
₹1.3 L
Yes
O/o Superintending Engineering PHE NL Circle
14 Nov 2025
1 Jul 2025
18 Jul 2025
2 Jul 2025
17 Jul 2025
2 Jul 2025
4 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .