Tender Value
₹1.9 L
EMD Value
₹2,500
Closing Date
14 Sept 2026, 6:00 pm2d left
AE (Civil)
Office of the General Manager Sodepur Area, P.O. Sundarchak, Dist.-Burdwan, West Bengal-713360
Repairing of switch room at Patmohana colliery under BMP Group, SDPA.
2026_ECL_364911_1
SDPA/Civil/G-11/26-27/49 Dt-04.09.2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Sodepur Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
4 Sept 2026
4 Sept 2026
15 Sept 2026
4 Sept 2026
14 Sept 2026
4 Sept 2026
4 Sept 2026 - 11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A : Civil | |||||
| 1.01 | Earth work in excavation by mechanical means/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms,lift upto 1.5m,including getting out the excavated soil and disposal of surplas excavated soil as directed,within a lead of 50m.All kinds of soil. | 1.65 | Cum | 190.35 | ₹314.08 |
| 1.02 | Supplying & filling in plinth with sand under floors including,watering,ramming consolidating and dressing complete. | 0.74 | Cum | 1,098.15 | ₹810.43 |
| 1.03 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 14.75 | Sqm | 323 | ₹4,764.25 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level (1:2:4)(20mm nominal size aggregate | 1.13 | Cum. | 6,389.45 | ₹7,207.3 |
| 1.05 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.17 | Cum | 6,130.95 | ₹7,167.08 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level1:1.5:3 (1 Cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size) | 0.69 | Cum | 7,386.6 | ₹5,081.98 |
| 1.07 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 5.5 | Sqm. | 305 | ₹1,677.5 |
| 1.08 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | 48.13 | kg | 98.9 | ₹4,759.56 |
| 1.09 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | 3.6 | Cum | 150.2 | ₹540.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_377840.xls
BOQ • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .