Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.0 L+₹2,999.87 (1.00%)Accepted-Finance | ₹3.0 L+₹2,999.87 (1.00%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹3.1 L+₹5,999.74 (2.00%)Accepted-Finance JEUR TALUKA KARMALA DISTRICT SOLAPUR | SOLAPUR | MAHARASHTRA | 413001 | ₹3.1 L+₹5,999.74 (2.00%) | L3 | Accepted-Finance Accepted |
Tender Value
₹3.0 L
Closing Date
5 Aug 2026, 5:00 pmClosed
Sarpanch Gramsevak Grampanchayat Vadshivane
Grampanchayat Vadshivane Tal Karmala Dist Solapur
Constructing of Under Ground RCC Gutter Line Location of work At GP Office to A Stream of Water Village Vadshivane
2026_SOLAP_1323575_1
E-Tender/2026-27/02
Open Tender
Civil Works - Others
Percentage
180 days
Gaundare
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Exempted
7 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) | 1 | Cum | 165 | ₹164.84 |
| 2 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) | 1 | Cum | 187 | ₹186.81 |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M) | - | Cum | 629 | - |
| 4 | Item No. 4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete. | 1 | Cum | 92 | ₹91.91 |
| 5 | Item No. 5 :- Providing & supplying ISI standard R.C.C.pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all taxes (Central and local), inspection charges, transport to departmental stores/site, unloading and stacking etc 600 mm dia. RCC pipe class NP-II (2.5 M Length) | 83 | Rmt | 1,666 | ₹1,38,278 |
| 6 | Item No. 6 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, giving hydraulic testing etc. complete as directed by Engineer-in-charge (For all class of Ipines) Collar Joints . 600 mm dia. RCC pipe class NP-II (2.5 M Length) | 83 | Rmt | 497 | ₹41,251 |
| 7 | Item No. 7:- Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation,B.B.masonryinCM1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 X 90 cm internal size and depth upto 1.2 Mtr with Precast RCC Slab Cover | 3 | Nos | 13,786 | ₹41,358 |
| 8 | Item No. 8:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. | 0.8 | Job | 92 | ₹73.6 |
| 9 | Add 18% GST | - | % | 0.18 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_2266983.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .