Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹2.0 L+₹4,190.03 (2.10%)Rejected-Finance | ₹2.0 L+₹4,190.03 (2.10%) | L2 | Rejected-Finance FINANCIAL BID TO BE OPENED |
| 3 | L3₹2.1 L+₹8,380.05 (4.20%)Rejected-Finance 11 MUNSHIGUNGE ROAD KOLKATA 700023 | KOLKATA | WEST BENGAL | 700023 | ₹2.1 L+₹8,380.05 (4.20%) | L3 | Rejected-Finance FINANCIAL BID TO BE OPENED |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
23 Mar 2026, 2:00 pmClosed
EX ENGINEER
11 BELVEDERE ROAD KOL-700027
DEVELOPMENT OF UTTARAN I.P.S. PASSAGE AT 24/5A, 16B, 15/1D, J.K. PAUL ROAD ETC IN WARD NO-76
2026_KMC_1022262_1
KMC/IX/076/096/2025 - 2026/UTTARAN
Open Tender
CIVIL WORKS
Percentage
30 days
BOROUGH-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,000
2 Sept 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | - | SQM | 14.4 | - |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 2. Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | - | SQM | 40 | - |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 0.2 | SQM | 361 | ₹72.2 |
| 4 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. | - | SQM | 244 | - |
| 5 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | - | EA | 1,511.81 | - |
| 6 | Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster with neat cement after dismantiling the existing setting and taking out and refixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | - | EA | 1,583.76 | - |
| 7 | Sub Total | - | - | - | - |
| 8 | GST 18% | - | Nos. | - | - |
| 9 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
TD_DOCS.pdf
Tender Documents • 0.57 MB
BOQ_2512451.xls
BOQ • 0.28 MB
ROAD.pdf
Additional Documents • 2.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .