Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.7 CrAccepted-AOC AT DEOPAN PO SULEHI DIST JHARSUGUDA | JHARSUGUDA | JHARSUGUDA | ODISHA | L-1 | Accepted-AOC AGT DRAWN | |
| 2 | L-2₹3.8 Cr+₹9.1 L (2.44%)Rejected-Finance AT WARD NO 30 PO DHANKAUDA P S SADAR DIST SAMBALPUR 768006 ODISHA | SAMBALPUR | SAMBALPUR | ODISHA | 768006 | L-2 | Rejected-Finance UNSUCCESSFUL BIDDER | |
| 3 | L-3₹3.9 Cr+₹14.9 L (3.99%)Rejected-Finance AT MANGAL BAZAR P O JHARSUGUDA P S JHARSUGUDA DIST JHARSUGUDA 768202 ODISHA | JHARSUGUDA | JHARSUGUDA | ODISHA | 768202 | L-3 | Rejected-Finance UNSUCCESSFUL BIDDER | |
| 4 | L-4₹3.9 Cr+₹19.6 L (5.27%)Rejected-Finance AT JHARMUNDA PO BAGDEHI DIST JHARSUGUDA PIN 768220 | JHARMUNDA | JHARSUGUDA | ODISHA | 768220 | L-4 | Rejected-Finance UNSUCCESSFUL BIDDER | |
| 5 | L-5₹4.0 Cr+₹32.2 L (8.64%)Rejected-Finance 2 YOUR TENDER SUBMITTED ON 30 06 2026 ON E TENDER WEBSITE 3 YOUR PRICE BID OPENED ON 13 07 2026 ON E TENDER WEBSITE SIR THIS IS TO NOTIFY YOU THAT YOUR TENDER FOR THE WORK UNDER REFERENCE HAS BEEN | L-5 | Rejected-Finance UNSUCCESSFUL BIDDER |
Tender Value
₹4.9 Cr
EMD Value
₹4.9 L
Closing Date
23 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Circle Officer
Circle Office Sambalpur
Improvement of Kirmira to Sulei 0/000 km to 8/471km
2026_EICCL_126933_1
CCENC (R AND B)/19/2025-26
Open Tender
Civil Works - Roads
Percentage
180 days
Jharsuguda
2 documents required · 2 mandatory
₹10,000
₹4.9 L
Yes
14 Oct 2026
7 Mar 2026
24 Mar 2026
7 Mar 2026
23 Mar 2026
7 Mar 2026
7 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 9,936.5 | sqm | 8.45 | ₹83,963.42 |
| 2 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres as per Technical Specifications and as per Clause - 501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 5,323.13 | cum | 6.03 | ₹32,098.47 |
| 3 | Re-working of scarified bituminous surface suitably after supplementing base materials with sand and compacting finished surface as per Technical Specifications and as per Clause - 501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 5,323.13 | sqm | 17.9 | ₹95,284.03 |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 2,804.29 | sqm | 74.79 | ₹2,09,732.85 |
| 5 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per Technical Specifications and as per Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 894.29 | cum | 36.05 | ₹32,239.15 |
| 6 | Providing G.S.B. Gr-VI stone screaning materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 1,561.72 | cum | 2,429.1 | ₹37,93,574.05 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per approved Drawing & Technical Specifications and as per Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 2,064.86 | cum | 2,545.24 | ₹52,55,564.27 |
| 8 | Providing and Applying Primer Coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning the road surface and spreading primer @ 0.60kg per sqm using mechanical means as per Technical Specifications and as per Clause -501 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance & other taxes of materials, cost of labour, machinery, T&P etc complete. | 8,456.82 | sqm | 36.95 | ₹3,12,479.5 |
| 9 | Providing Tack coat on prepared bituminous surface with bitumen emulsion (RS) and spreading @ 0.20kg per sqm using mechanical means as per Technical Specifications and as per Clause -501 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance & other taxes of materials, cost of labour, machinery, T&P etc complete. | 47,956.83 | sqm | 12.91 | ₹6,19,122.68 |
| 10 | Providing 50mm compacted thick Bituminous Macadam of grading -2 using crushed stone Gr.-2 materials & 60/70 penetration grade of bitumen preparing preemixed materials with bituminous binder with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per clauses 501 and 504 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 626.84 | cum | 7,997.35 | ₹50,13,058.87 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.95 MB
Tendernotice_3.pdf
PDF • 0.98 MB
Tendernotice_1.pdf
PDF • 3.57 MB
BOQ_584139.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .