Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 85 PANNADI KATTUVALAVU THOTTILPATTY SALEM CAMP METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | Admitted-Finance |
| 2 | Admitted-Finance 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹24,750
Closing Date
14 Mar 2022, 2:00 pmClosed
CE/MTPS-II
CE/MTPS-II METTUR DAM
MTPS II CHP Breakdown Work Preventive Maintenance Works Assistance for carrying out cold Vulcanizing belt joint replacement of worn out damaged conveyors belt removal of weak joint excess elongation of conveyor belt in CHP Division
2022_EB_223311_1
OT76/2021-22
Open Tender
Miscellaneous Works
Works
180 days
MTPS-II METTUR DAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹24,750
Yes
23 Mar 2022
28 Feb 2022
15 Mar 2022
28 Feb 2022
14 Mar 2022
28 Feb 2022
Amount
Charges for transporting from Central Stores/MTPS-II or from Pocket Stores and positioning of new 1200mm, 1400mm, 1800mm and 2000 mm conveyor belt drum near junction towers, arranging pulleys, cutting & removal of worn out damaged belt from 1200mm, 1400mm, 1800mm and 2000 mm width conveyor, releasing the belt from drum including lead, lift, laying and tensioning the conveyor belt etc. rolling the released wornout/damaged belt , devoluting the belt scrap to Central Stores/MTPS-II
Charges for unloading counter weight from counter weight box, arranging chain block and belt clamps, lifting counter weight box to the required level and after completion of belt joint work, releasing the counter weight box loading the counter weight in all conveyors
Charges for loosening & tightening the belt tensioning device and making platform to carryout cold vulcanizing joint and assembling the same & removing the platform, after completion of joint work in boom conveyor / intermediate conveyor of SCR machine-I & II
Charges for assisting for carrying out one number cold vulcanizing joint in 1200mm & 1400mm width conveyor belt which includes removing of idlers from the idler stand, idler frame of about 15 nos. cutting and removal of worn out/damaged joint and excess elongated belt, pulling by using steel wire rope, positioning the belt, arranging platform and after completion of cold vulcanizing, releasing belt clamp, fixing idlers, idler frame and assisting for trial run of the conveyor
Charges for positioning the belt ends, arranging platform and clamps, assistance for making 1 No. cold vulcanizing joint in 1200mm/1400mm width conveyor belt on ground floor.
Charges for Vulcanizing (cold) joint 1200mm/1400mm width Belt
Replacement of 1800mm width conveyor belt work in belt feeders
Charges for dismantling Belt Feeder pulley hood, skirt board, cutting & removal of wornout /damaged belt. Removing idler, idler frame. Adjusting the tension screw and position the tail pulley. Cutting & removal of 1800mm width new conveyor belt from roll, transporting, leading, lowering to Belt Feeder lifting floor. Removing belt scrap from Belt feeder area and devoluting to Central Stores/MTPS-II
Charges for laying new belt on Belt Feeder. Clamping the belt. Assistance for making 1 No. cold vulcanizing joint. After completion of work releasing belt clamps fixing idler, idler frames, skirt board, pulley hood etc., adjusting the belt tension and trial run of the Belt Feeder.
Charges for complete loosening the belt feeder tensioning device for loosen the belt and lifting the non drive pulley by using chain pulley block and wire rope along the two piece pillow block dismantling of tensioning device for attending repair work at work spot or replacement of new belt tensioning device in position erection of pulley along with two piece pillow block positioning and tightening on all belt feeders
Charges for Vulcanizing (cold) joint 1800/2000 mm width Belt
Charges for Providing Rubber Lagging over various pulleys in the conveyor system with 10mm thick rubber sheet
Charges for Providing Rubber Lagging over various pulleys in the conveyor system with 12mm thick rubber sheet(Diamond Lagging)
aarthiconstruction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .