Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram - 623536
Periodical, running maintenance and Break down maintenance of 1No. 59.9MW Gas Turbine (GT), 2Nos. 2500KW Gas Booster Compressors (GBC) and their accessories for a period of Six months from 01.04.2021 to 30.09.2021.
2021_EB_194797_1
SE/VGTPS/RMD/WC.NO.165/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
24 Feb 2021
9 Feb 2021
24 Feb 2021
9 Feb 2021
23 Feb 2021
9 Feb 2021
180 days
Amount
Periodical and running maintenance of GT and GBC Systems
Attending Periodical maintenance works of Gas Booster Compressors : Charges for periodical maintenance of the Gas Booster Compressors for visual inspection of gas, air, oil and water piping system for leaks and general checks for proper functioning of the system and attending the corrective action as per the direction of engineer in-charge, up keeping of the Twin oil Coolers, Duplex Filter housings, 8Nos of Gas Coolers, LP and HP compressor, gearbox, lube oil pumps by thorough external cleaning and keeping the floor, platform of the houses clean and tidy, checking the oil level and topping up of the lube oil using centrifuge as required, climbing up and visual inspection of expansion oil tank and connected pipe lines for any leakages and attending any other minor unforeseen works related to the mechanical maintenance of the system as directed by the Engineer in-charge
Attending Periodical maintenance works of Gas conditioning skid: Charges for periodical maintenance of the Gas conditioning skid, visual inspection of gas leaks and general checks for the proper functioning of the system and attending minor corrective action as per the direction of Engineerin-charge in the Gas scrubber, Gas conditioning skid and the Gas drain collection tank, Up keeping of the Gas scrubber, Gas conditioning skid and the Gas drain collection tank by thorough external cleaning and keeping the system clean and tidy, Draining of condensates from the scrubber, various locations in the conditioning skid and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineerin-charge
Attending Periodical maintenance works of the Gas Turbine (59.9 MW), GT Accessories like Lube oil skid, Gas skid, Mist Eliminator & Exhaust system of Gas Turbine: Charges for periodical maintenance of Gas Turbine for any abnormal sound and temperature and visual inspection of gas, water, air and lube oil piping system for leaks, leaky gaskets, pump and valve packing leaks, vibration of piping and general checks and attending the corrective action required as per the direction of the Engineer in-charge. (Refer SECTION-VI (A-3) In Tender Document)
Attending Periodical maintenance works in the Inlet Air filter house & Air Processing unit of GT: Charges for periodical maintenance of GT Air Processing Unit (APU) & Inlet Air Filter House of GT for any abnormal sound. Checking the air processing unit for proper functioning of the unit, draining the moisture collected in the APU, checking & attending minor Air leak in the Air filter house, replacement of damaged Air flexible hoses for leak proof system to ensure proper compression and attending any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in-charge.
Attending Periodical maintenance works of Gas Turbine Ventilation fans, Blowers and Cooling and Sealing air fans: Turbine compartment cooling air fan : 4Nos. Turbine exhaust frame air blower : 2Nos. GT Lube oil skid cooling fans : 2Nos. GT Gas valve compartment cooling air Fan : 2Nos. GT Load compartment cooling fan : 2Nos. DD Seal air fans : 2Nos. GD Seal air fans : 2Nos. Charges for periodical maintenance of Gas Turbine ventilation fans, blowers and cooling and sealing air fans by thorough cleaning of the fan casings and the dampers, greasing the damper’s actuators and check for free operation of the standby dampers, Checking the tightness of bed bolts of all the above fans, Inspecting and up keeping of all cooling sealing air fans for proper functioning as per the direction of Engineer in-charge and any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in-charge.
Operational Assistance for routine changeover of equipments: Charges for providing operation assistance during changeover of GT auxiliaries such as 88TK, 88BT, 88BX, 88VG, 88BL, 88VL, 88QV, DD seal air fan & GD seal air fan, checking of damper operation, vibration checks and attending any other unforeseen minor works related to the mechanical maintenance as directed by the Engineer in - charge.
Breakdown Maintenance
Attending Breakdown maintenance works of Seal air fans of Diverter damper, Guillotine damper and 88 TK fans: Dismantling the outer cover and gasket. Disconnecting the fan from motor shaft and cleaning of fan housing. Inspecting the NRV, inspecting for any damage Reassembling the fan on motor shaft and closing the cover with new gasket in place. Removal of bearings of NRV flap, inspecting them for healthiness and replacing if necessary. (Bearings will be supplied by the Board.) Packing grease and reassembling the NRV & normalizing as directed by the Engineer in-charge
GT Guillotine / Diverter damper inspection work : This work involves GT Guillotine damper manhole door and Diverter damper manhole door open and visual inspection and manhole door closing work and manual opening and closing of GD & DD as per the direction of Engineer in - charge.
GT Diverter Damper/Guillotine damper Manual operation during failure of Auto operation: Charges for manual operation of Diverter Damper by enabling local mode & engaging the clutch lever & applying enormous manpower to rotate the manual hand lever to facilitate open/close of Diverter Damper in case of failure of auto operation of Diverter Damper as per the direction of Engineerin-charge
Attending Breakdown maintenance works of Oil Centrifuges: Opening the collecting cover, unscrewing the lock rings using special tools, lifting off of gravity disc, disc stack and distributor,lifting out bowl body, disconnecting piping connections removing the outlet parts, soaking and cleaning of all parts thoroughly, Removing the outlet housing, separator bowl, Removing the pump assembly, inspecting the bushings and wear of seals, replacing them with new one supplied by the Board, Dismantling of worm and worn wheel for inspection, replacing of components supplied by the Board, Cleaning of oil sump, Dismantling the horizontal driving device, replacing worm shaft if damaged. (Worm shaft will be supplied by TANGEDCO) Removal of pads on the friction blocks. (Pads will be supplied by TANGEDCO) Reassembling the drives, connecting piping, gravity disc, bowl, collecting cover and normalizing as per the direction of Engineer in-charge
Attending Breakdown maintenance works of Mist Eliminator: Break down maintenance of mist eliminator work comprises of dismantling of mist eliminator fan from motor shaft by using appropriate tools carefully, at a height of Approximately 3 metre, after the removal of fan cover and assessment of fan surfaces for any damage or loss of material, complete cleaning of blade surfaces with petrol, diesel reassembling the fan blade with motor shaft, commissioning the mist eliminator and normalizing as per the direction of Engineerin-charge
Attending Break down maintenance works of GBC Valves: Break down maintenance of GBC suction valve/Discharge/Seal gas valve/Anti surge valve by dismantling the top casing, inspection of worm shaft, worm gear, gear wheel for any damages, attending minor rectification works, replacement of bearings if necessary grease packing, inspection of Diaphragam for any damages & replacement of diaphragam, if necessary, reassembling the gear wheel, worm gear, worm shaft and ensuring free operation of valve, attending gas leak in valve, if any as per the direction of Engineerin-charge
Attending Break down maintenance works of APU & Air filter house of GT: Break down maintenance work in Air processing Unit of GT by removing the fasteners and releasing the prefilters/After filter cartridge thorough cleaning/replacement of filter cartridge, if necessary, or draining of old dessicants and replacing with new dessicant or inspection/replacement of 3-way valve for proper functioning the APU as per the direction of Engineer in charge or attending minor repair works in GT Air Filter house by air leak arresting by replacing the gaskets in Air pipeline as per the direction of Engineer in-charge.
Attending Break down maintenance works in water wash skid: Attending Break down maintenance in GT water wash skid by attending water leak in water wash tank by welding, inspection of suction/discharge valves for proper function & replacement/ reconditioning of valve if necessary (or) decoupling the water wash/detergent pump from motor after isolating the suction & discharge line & disassembly of the pump, checking the bearings & seals of the pump and replace the failed bearings & seals by new one, replace the parts if any as required which will be supplied by the TANGEDCO& reassembling the pump, Alignment checking & coupling with the motor all complete & normalizing as per the direction of Engineerin-charge.
Minor welding work: Charges for attending any minor weld defects in lube oil, air and water lines and support structures by welding, etc., as per the direction of Engineer in-charge.
GT & GBC Startup Assistance: Charges for providing startup assistance in Gas Turbine, Gas Booster Compressor and its auxiliaries by attending water/oil/gas leak and Air vent releasing in Lube Oil Line and Checking for any abnormalities in the system during the startup as per the direction of Engineerin-charge.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .