Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance MOULIVAKKAM 116 | NAGAPATTINAM | TAMIL NADU | 608002 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
22 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner, Dindigul City Municipal Corporation
9/13, Main road, Corporation Office, Dindigul
Formation of Road in Ishwarya Nagar
2024_MAWS_426346_9
7108 / 2023 / E4
Open Tender
Civil Works
Works
30 days
ishwarya garden
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,200
22 Feb 2024
19 Feb 2024
22 Feb 2024
19 Feb 2024
22 Feb 2024
19 Feb 2024
Amount
Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete.
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with primer using 2.5 kgs of bituminous Emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 505 MORTHRev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 45.27 kgs of VG30 & 5.03 kg of plastic waste (total.50.30 kg) bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tone vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 507 MORTHRev-5
stage.html
html • 0.02 MB
finance_508069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .