| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAdmitted-Finance 294241 NAIBEDYA AGARTALA BISHALGARH ROAD BARDOWALI A D NAGAR WEST TRIPURA TRIPURA 799003 | 294241 | ₹8.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.9 Cr+₹56.7 L (6.77%)Admitted-Finance | ₹8.9 Cr+₹56.7 L (6.77%) | L2 | Admitted-Finance |
| 3 | L3₹9.4 Cr+₹1.1 Cr (12.6%)Admitted-Finance 5TH EAST POINT TOWER BAMUNIMAIDAN BAMUNIMAIDAN KAMRUP M ASSAM 781021 | KAMRUP METRO | ASSAM | 781021 | ₹9.4 Cr+₹1.1 Cr (12.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | oval projects engineering pvt ltd L1 | M/s P K Construction L2 | Mech Technik (India) Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00SECTION:A- PIPING & MECHANICAL WORKS | ||||||
| 2.00PLANT PIPING (ABOVEGROUND) FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING : | ||||||
| 3.00Transportation including loading, unloading, handling of all piping items from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications indicated in SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT. | ||||||
| 4.00Fabrication including cutting, edge preparation, cutting & rebevelling due to dent/damage in pipe, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, coupling etc. as required for completion of job. | ||||||
| 5.00Fittings, flanges, vent and drain point connection etc. (as per drawing) including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required. Installation of RO etc. | ||||||
| 6.00Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding. | ||||||
| 7.00Erection including prior cleaning, leveling of ground, lifting, placing on pipe sleepers and supports, overhead on racks, skids, trestles, installation of pipe in culverts and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, tie-in with existing piping/facilities, etc. | ||||||
| 8.00Survey of piping route for preparation of AFC drawings/GAD, preparation of final bill of material based on piping GADs. | ||||||
| 9.00Preparation of isometric and fabrication drawings. | ||||||
| 10.00Carrying out 100% Non-destructive testing. | ||||||
Tender Value
Refer Docs
EMD Value
₹14.7 L
Closing Date
3 Apr 2026, 2:00 pmClosed
DGM Ic Contracts
MECON LIMITED DELHI
LAST MILE CONNECTIVITY WORK INSIDE NRL UNDER GUWAHATI NUMALIGARH PIPELINE SECTION 1 UNDER NEGG PROJECT OF IGGL
2025_IGGL_253876_1
05/51/23VC/IGGL/001(i)-NRL
Open Tender
Miscellaneous Works
Works
105 days
Guwahati
As per tender
13 documents required · 13 mandatory
₹0
₹14.7 L
Yes
Online
5 May 2026
7 Mar 2026
4 Apr 2026
7 Mar 2026
3 Apr 2026
20 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION:A- PIPING & MECHANICAL WORKS | - | - | - | - |
| 2 | PLANT PIPING (ABOVEGROUND) FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING : | - | - | - | - |
| 3 | Transportation including loading, unloading, handling of all piping items from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications indicated in SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT. | - | - | - | - |
| 4 | Fabrication including cutting, edge preparation, cutting & rebevelling due to dent/damage in pipe, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, coupling etc. as required for completion of job. | - | - | - | - |
| 5 | Fittings, flanges, vent and drain point connection etc. (as per drawing) including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required. Installation of RO etc. | - | - | - | - |
| 6 | Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding. | - | - | - | - |
| 7 | Erection including prior cleaning, leveling of ground, lifting, placing on pipe sleepers and supports, overhead on racks, skids, trestles, installation of pipe in culverts and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, tie-in with existing piping/facilities, etc. | - | - | - | - |
| 8 | Survey of piping route for preparation of AFC drawings/GAD, preparation of final bill of material based on piping GADs. | - | - | - | - |
| 9 | Preparation of isometric and fabrication drawings. | - | - | - | - |
| 10 | Carrying out 100% Non-destructive testing. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Vol1web.pdf
Tender Documents • 16.43 MB
Vol3web.pdf
Tender Documents • 11.77 MB
Vol2web.pdf
Tender Documents • 7.50 MB
BOQ_313948.xls
BOQ • 1.18 MB
Corr2web.pdf
PDF • 0.71 MB
Corr1RPBQweb.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .