| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC | ₹19.6 L | L1 | Accepted-AOC Accept |
| 2 | L2₹19.7 LRejected-AOC | ₹19.7 L | L2 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | GIRI SAHAJANYA PROJECTS L2 | ANNAMALAIYAR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Providing Fencing for Abandoned Quarry (1) at Minnampalli H/O Minnampalli MINES AND MINARALS 25-26 Work No.01. | |||||
| 2.00 | Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B. | 33.82 | cum | 197.22 ₹6,669.98 | 197.22 ₹6,669.98 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete | 6.76 | qum | 4,990.36 ₹33,734.83 | 4,934.36 ₹33,356.27 |
| 4.00 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 601.2 | qum | 530.5 ₹3.2 L | 516 ₹3.1 L |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.98 | cum | 89,883.5 ₹1.8 L | 89,883.5 ₹1.8 L |
| 6.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete | 49.6 | cum | 6,327.58 ₹3.1 L | 6,307.58 ₹3.1 L |
| 7.00 | Reinforced cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 18.04 | cum | 7,971.51 ₹1.4 L | 7,971.51 ₹1.4 L |
| 8.00 | Supplying and fixing of 10 gauge GI chain link 2' x2' using Galvanised Iron Wires-Rate for 10 Sqm | 2,102.1 | cum | 262.06 ₹5.5 L | 262.06 ₹5.5 L |
| 9.00 | Supply of barbed wire 10gauge two ply and four pronged Galvanised-100Rm | 4,671.33 | cum | 16.1 ₹75,208.41 | 16.1 ₹75,208.41 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification | 200.4 | eac | 249.06 ₹49,911.62 | 249.06 ₹49,911.62 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
22 Nov 2025, 1:00 pmClosed
BDP VP Ayothiyapattnam
BDP VP Ayothiyapattnam
Salem District - Ayothiyapattnam Providing Fencing for Abandoned Quarry (1) at Minnampalli H/O Minnampalli in MINES AND MINARALS 2025-2026 Work No.01.
2025_RDTN_624041_1
656/20258/T2
Open Tender
Civil Works
180 days
BDP VP Ayothiyapattnam
As on below
2 documents required · 2 mandatory
₹0
₹20,000
BDP VP Ayothiyapattnam
26 Feb 2026
17 Nov 2025
22 Nov 2025
17 Nov 2025
22 Nov 2025
17 Nov 2025
17 Nov 2025
Amount
Providing Fencing for Abandoned Quarry (1) at Minnampalli H/O Minnampalli MINES AND MINARALS 25-26 Work No.01.
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Reinforced cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying and fixing of 10 gauge GI chain link 2' x2' using Galvanised Iron Wires-Rate for 10 Sqm
Supply of barbed wire 10gauge two ply and four pronged Galvanised-100Rm
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GIRI SAHAJANYA PROJECTS (BID ID -1517944)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
01.pdf
Tender Documents • 0.49 MB
BOQ_746185.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid