Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance AKALA JAJOOPUR BASTI | BASTI | BASTI | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
3 Jan 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
EDC, Ayodhya
Shifting of 250 KVA Transformer Naer Retiya Naya Purwa Dhal Niywan Under Electricity Distribution Division-Ist, Ayodhya
2022_MVVNL_762139_1
108 H(F)(W)/2022-23
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer. EDC
₹2,000
11 Jan 2023
28 Dec 2022
4 Jan 2023
28 Dec 2022
3 Jan 2023
28 Dec 2022
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
ST Pole 11 Mtr. long
9 KV 5 KA Lightening Arrester
LT Incoming Pannel with Metering equipments
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Construction of Plinth of Transformer Size 2x2x1.5 Mtr including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
FRP Fencing of Transformer Plinth With Installation (all the material will be supplied by the contractor.)
Dismentling of old line and Transformer
Installation and Fixing of 9 KV 5 KA Lighting Arrestor
Installation of LT Incoming Pannel with Metering equipments and Fixing Aggangments.
ALOK KUMAR SINGH
M/S KRISHNA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .