Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.5 Cr+₹21.9 L (2.36%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.7 Cr+₹47.9 L (5.17%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.8 Cr+₹49.4 L (5.34%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹10.0 Cr+₹73.3 L (7.91%)Admitted-Finance ONE CRORE FOURTY SEVEN LAKH | L5 | Admitted-Finance |
Tender Value
₹10.8 Cr
EMD Value
₹21.7 L
Closing Date
25 Sept 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Chief Engineer
Addl. Chief Engineer PWD Zone Kothi No 9 Civil Line Bikaner
CONSTRUCTION OF CRITICAL CARE BLOCK IN PBM HOSPITAL BIKANER
2024_CEPWD_417268_1
NIT No 05 of 2024-25 Addl. Chief Engineer PWD Zone Bikaner
Open Tender
Civil Works - Buildings
Percentage
365 days
Bikaner
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive Engineer
₹21.7 L
Yes
11/09/2024 Bikaner
8 Nov 2024
6 Sept 2024
26 Sept 2024
6 Sept 2024
25 Sept 2024
6 Sept 2024
11 Sept 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 10,270.94 | Sqm | 5 | ₹51,354.7 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil. | 2,392.19 | cum | 175 | ₹4,18,633.25 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 2,082.38 | cum | 64 | ₹1,33,272.32 |
| 4 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 3,632.99 | Cum | 450 | ₹16,34,845.5 |
| 5 | Carriage for 4km(Building Rubbish Stone metal (Grit and ballast etc.) | 3,000 | cum | 107 | ₹3,21,000 |
| 6 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concentrate of 20% | 1,301.87 | LTR | 243 | ₹3,16,354.41 |
| 7 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) . | 1,808.16 | Sqm | 47 | ₹84,983.52 |
| 8 | Providing and laying in position cement cocrete including curing, compaction etc. of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).. | 436.01 | cum | 3,302 | ₹14,39,705.02 |
| 9 | Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering.M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 346.67 | cum | 4,320 | ₹14,97,614.4 |
| 10 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M25 grade Nominal Mix / Design Mix | 481.04 | cum | 5,003 | ₹24,06,643.12 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.11 MB
Agreement.pdf
Tender Documents • 15.39 MB
GeneralandSpecialCondition.pdf
Tender Documents • 16.40 MB
FinancialAssessmentDocumentPDF.pdf
Tender Documents • 5.15 MB
GST_0001.pdf
Other Document • 0.73 MB
NITDateCorrizendum.pdf
Tender Documents • 0.41 MB
RTTPAct_Criclulars.pdf
Tender Documents • 1.30 MB
PostQualificationBid.PDF
Tender Documents • 3.71 MB
Correctness_Certificate_BldgRD.pdf
Tender Documents • 0.05 MB
BOQ_750332.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .