Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.3 LAdmitted-Finance | ₹54.3 L | L1 | Admitted-Finance |
| 2 | L2₹56.8 L+₹2.5 L (4.59%)Admitted-Finance | ₹56.8 L+₹2.5 L (4.59%) | L2 | Admitted-Finance |
| 3 | L3₹59.5 L+₹5.3 L (9.69%)Admitted-Finance | ₹59.5 L+₹5.3 L (9.69%) | L3 | Admitted-Finance |
| 4 | L4₹61.7 L+₹7.4 L (13.7%)Admitted-Finance | ₹61.7 L+₹7.4 L (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹62.1 L+₹7.8 L (14.4%)Admitted-Finance | ₹62.1 L+₹7.8 L (14.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BIBEKANANDA MOHAPATRA L7 | Manas Ranjan Pal L9 | M/s.SAI SHREYASI CONSTRUCTION L4 | PRASHANT KUMAR BALIYARSINGH L5 | Baishnab Charan Nayak L1 | Samir Ranjan Barman L12 | Skater Infratech India Pvt. Ltd. L10 | M/s. P N Construction L13 | MAA DAKHINAKALI ENTERPRISERS L6 | Padmanav Lenka L2 | ALEKHA SWAIN L3 | LAXMIDHAR ROUT L11 | M/S. BIKRAM KUMAR SAMAL L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Supplying the following machinery as and when required for excavation of suitable drains & outlets and engaging the machineries at required location inside prohibited areas for discharge of rain/storm water, for removal of spillage coal for discharge of stagnated water from plots with supply of operator, T&P, including transportation, hire and running charges of machineries, fuel & consumable charges, gate entry fees, tollage,with all taxes excluding GST etc. all complete as directed by Engineer-in-charge. N.B : a) Payment shall be made for actual hours of engagement of following machinaries based on joint signed log sheets by Deptt.& contractor with maintained by the contractor .b) No idle charges & shifting charges of machinaries from one place to another place shall not be paid , c) Contractor must be attend the work in odd hours and emergency period). | ||||||||||||||||
| 1.10 | Excavator of 2.00 Cum bucket capacity | 480 | Each Hour | 650 ₹3,12,000 | 800 ₹3,84,000 | 1,300 ₹6,24,000 | 1,000 ₹4,80,000 | 100 ₹48,000 Lowest | 1,800 ₹8,64,000 | 1,000 ₹4,80,000 | 500 ₹2,40,000 | 2,800 ₹13,44,000 | 750 ₹3,60,000 | 1,400 ₹6,72,000 | 1,260 ₹6,04,800 | 1,533.33 ₹7,35,998.4 |
| 1.20 | Excavator of 1.00 Cum bucket capacity (J.C.B) | 2,954 | Each Hour | 650 ₹19,20,100 | 800 ₹23,63,200 | 650 ₹19,20,100 | 1,000 ₹29,54,000 | 1,100 ₹32,49,400 | 950 ₹28,06,300 | 900 ₹26,58,600 | 750 ₹22,15,500 | 619.43 ₹18,29,796.22 Lowest | 800 ₹23,63,200 | 800 ₹23,63,200 | 657 ₹19,40,778 | 773.33 ₹22,84,416.82 |
| 1.30 | Tractor | 5,908 | Each Hour | 312 ₹18,43,296 | 300 ₹17,72,400 | 270 ₹15,95,160 | 100 ₹5,90,800 Lowest | 150 ₹8,86,200 | 250 ₹14,77,000 | 300 ₹17,72,400 | 400 ₹23,63,200 | 182.33 ₹10,77,205.64 | 180 ₹10,63,440 | 120 ₹7,08,960 | 351 ₹20,73,708 | 183.33 ₹10,83,113.64 |
| 2.00 | Dewatering the stagnated rain water from different drains & outlets as and when necessary using 10 H.P/ 5 H.P SS diesel pump as per requirement, discharging water to near by drains, basins and other points by sufficient length delivery pipe, including supply of all labour, T&P, all taxes, hire and running charges of pump, fuel charges, transportation of pumps from one location to other location, all POL, suction and delivery pipe, engagement of pump operator in all three shifts as and when required etc. complete excluding GST and as directed by Engineer in charge.
NB : (1) No idle hours shall be paid.
(2) Expense towards deployment of labour shall be paid against item No.3.
(3) Payment shall be based on jointly signed log sheet maintained by contractor on daily basis. | 840 | Each Hour | 60 ₹50,400 | 50 ₹42,000 | 100 ₹84,000 | 200 ₹1,68,000 | 1 ₹840 Lowest | 80 ₹67,200 | 100 ₹84,000 | 600 ₹5,04,000 | 120 ₹1,00,800 | 50 ₹42,000 | 70 ₹58,800 | 108 ₹90,720 | 333.33 ₹2,79,997.2 |
| 3.00 | Supply of unskilled labour for cutting of rain cut & cleaning the drains faces along with cleaning the drain and road as and where required with supply of all T&P, special T&P,, taxes, gate entry fee, etc. all complete as per direction of Engineer-in-charge. | 3,360 | Each Mandays | 650 ₹21,84,000 | 650 ₹21,84,000 | 580 ₹19,48,800 | 600 ₹20,16,000 | 370 ₹12,43,200 Lowest | 580 ₹19,48,800 | 565 ₹18,98,400 | 600 ₹20,16,000 | 570 ₹19,15,200 | 550 ₹18,48,000 | 640 ₹21,50,400 | 702 ₹23,58,720 | 650.33 ₹21,85,108.8 |
Tender Value
₹94.5 L
EMD Value
₹1.9 L
Closing Date
14 Aug 2026, 5:15 pmClosed
EE,HWD-II,PPA
Office of the Harbour Works Division No.II, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Mob-9938935675
Cleaning of drains, culverts leading from Gate No.3 to old Dock Canteen, Gate No.3 alongside net barrier upto PICT railway control room, ATBK-II to Ghanagalia Creek, drain alongside ATBK-I upto siding No.11 , ATBK-I to settling pond near gate No.3...
2026_MoS_918928_1
CE/ HW-II-W-05/2026/167
Open Tender
Civil Works
Works
730 days
paradip
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
As mentioned in eTCN and TD
₹1.9 L
Yes
28 Aug 2026
24 Jul 2026
17 Aug 2026
24 Jul 2026
14 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying the following machinery as and when required for excavation of suitable drains & outlets and engaging the machineries at required location inside prohibited areas for discharge of rain/storm water, for removal of spillage coal for discharge of stagnated water from plots with supply of operator, T&P, including transportation, hire and running charges of machineries, fuel & consumable charges, gate entry fees, tollage,with all taxes excluding GST etc. all complete as directed by Engineer-in-charge. N.B : a) Payment shall be made for actual hours of engagement of following machinaries based on joint signed log sheets by Deptt.& contractor with maintained by the contractor .b) No idle charges & shifting charges of machinaries from one place to another place shall not be paid , c) Contractor must be attend the work in odd hours and emergency period). | |||||
| 1.1 | Excavator of 2.00 Cum bucket capacity | 480 | Each Hour | - | - |
| 1.2 | Excavator of 1.00 Cum bucket capacity (J.C.B) | 2,954 | Each Hour | - | - |
| 1.3 | Tractor | 5,908 | Each Hour | - | - |
| 2 | Dewatering the stagnated rain water from different drains & outlets as and when necessary using 10 H.P/ 5 H.P SS diesel pump as per requirement, discharging water to near by drains, basins and other points by sufficient length delivery pipe, including supply of all labour, T&P, all taxes, hire and running charges of pump, fuel charges, transportation of pumps from one location to other location, all POL, suction and delivery pipe, engagement of pump operator in all three shifts as and when required etc. complete excluding GST and as directed by Engineer in charge.
NB : (1) No idle hours shall be paid.
(2) Expense towards deployment of labour shall be paid against item No.3.
(3) Payment shall be based on jointly signed log sheet maintained by contractor on daily basis. | 840 | Each Hour | - | - |
| 3 | Supply of unskilled labour for cutting of rain cut & cleaning the drains faces along with cleaning the drain and road as and where required with supply of all T&P, special T&P,, taxes, gate entry fee, etc. all complete as per direction of Engineer-in-charge. | 3,360 | Each Mandays | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_965694.xls
BOQ • 0.28 MB
CORRIGENDUM.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .