Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC TAMIL NADU N | KANCHIPURAM | TAMIL NADU | 600069 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.5 L+₹11,500 (8.58%)Rejected-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
16 Apr 2024, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Replacement of existing worn out / damaged SCN-500 Gear box by a spare one in Conveyor-58B.
2024_EB_449587_1
CE/SE/MI/TTPS/85/2024-2025
Open Tender
Miscellaneous Works
Works
10 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,400
Yes
5 Jul 2024
16 Mar 2024
17 Apr 2024
16 Mar 2024
16 Apr 2024
16 Mar 2024
Charges for the drawal of spare gear box from stores and loading both (Released & Spare) gear box from and to TTPS site.
Charges for loading and transporting both (Released & Spare) gear box from and to TTPS site and unloading at the workspot (While carrying this work, the grid coupling could not be released from gear box shaft, it will be transport to local workshop for releasing the grid coupling by using special equipment).
Charges for decoupling gear box from head pulley slow speed coupling, removing RMT flexible element, and brake assembly from bed. Drain oil from gear box, removing gear box bed bolt, removing the cooling fan cover from input shaft, leading and lifting the gear box from the bed.
Charges for measuring and preparing output shaft, transporting of waste oil about 1 barrel available at site heating the released slow speed coupling in oil bath gear box to pulley coupling size to the required temperature, lifting, positioning and shrink fitting the coupling with spare gear box shaft. After cooling of waste oil stored in drums and kept inside the pocket store.
Charges for arranging the chain block, leading, lifting the spare gear box after assembling the slow speed coupling on output shaft and brake drum on input shaft of the spare gear box and positioning the overhauled gear box on the bed, filling SP 320 oil to the required level.
Changing the drive in any one of the drive conveyor from drive B and hold back checking in the fluid coupling, including T&P’s hire charges and consumables.
Alignment of gear box to fluid coupling 1 no alignment fluid coupling to HT motor 1 no alignment, including T&P’s hire charges and consumables.
Coupling the fluid coupling with gear box and HT motor by 2 nos. resilient coupling, topping up of oil commissioning, trial run etc., including T&P’s hire charges and consumables.
KUMAAR ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .