Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Attached |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Attached |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Attached |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Attached |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
31 Aug 2026, 6:00 pmClosed
Er. Sajeev Kumar Gupta (SE PWD(Rand) Circle Udhamp
PWD(RandB) Circle Office Udhampur
Refer to BOQ
2026_PWDJK_320140_1
e-NIT No. 46 of 2026-27 dated 08-08-2026
Open Tender
Civil Works
Percentage
365 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹6,000
Superintending Engineer PWD RandB Circle Udhampur
₹5.8 L
Udhampur
1 Sept 2026
8 Aug 2026
1 Sept 2026
8 Aug 2026
31 Aug 2026
8 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of Existing Structure Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar. | |||||
| 2 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead :
Of area of 3 sqm. and below. | - | each | 1 | - |
| 3Engaging Labour for dismantling wooden truss/ purlins/ vertical posts etc complete. | |||||
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix). | 1 | cum | - | - |
| 5 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : G.S. Sheet | 1 | sqm | 125.35 | ₹125.22 |
| 6 | Dismantling wooden ballies in posts and struts including stacking within 50 meters lead. | - | mtr | 14.85 | - |
| 7 | Civil Part Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | - | cum | 1 | - |
| 8Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter from cutting edge All kinds of soil : | |||||
| 9 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil : | 1 | cum | 89.75 | ₹89.66 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | cum | 218.4 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_1062772.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .