Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Finance | ₹13.9 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 L+₹3.3 L (23.4%)Admitted-Finance 206 PARADISE COMPLEX NEAR KALA GHODA CIRCLE SAYAJIGANJ VADODARA GUJARAT 390020 | VADODARA | GUJARAT | 390020 | ₹17.2 L+₹3.3 L (23.4%) | L2 | Admitted-Finance |
| 3 | L3₹20.6 L+₹6.7 L (47.9%)Admitted-Finance | ₹20.6 L+₹6.7 L (47.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Corrxperts Private Limited L2 | SILVERLINER INTEGRITY SERVICES L3 | AE INTEGRITY PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00DIRECT ASSESSMENT (DA) SURVEY of NATURAL GAS PIPELINES . For 32” N.B. X 1km Length Natural Gas Pipeline | ||||||
| 1.01 | Conduct Integrity Inspection for AGCL's pipeline inclusive of all four steps of Direct Assessment (ECDA, ICDA, SCCDA) Methodogy i.e. Pre-Assessment, Indirect Inspection, Direct Examination and Post Assessment. Based on that report, Conduct detailed NDT and assist in Defect Rectification works (if found) for enhancing the economic life of the pipeline for a minimum additional block of 3 years from its already available remaining life. Defect rectification (if found any) will be on AGCL’s scope. After defect rectification, evaluate the remaining life of the pipeline and submit remaining life, safe pressure and fit for use certificate. | 1 | LS | 14,55,635 ₹17,17,649.3 | 17,45,550 ₹20,59,749 | 11,80,000 ₹13,92,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
7 Jul 2026, 6:00 pmClosed
Managing Director
Assam Gas Company Limited Duliajan Dist Dibrugarh Pin 786602 Assam
Re-integrity assessment of 32 inch PL
2026_ICD_52842_1
C and P/PL/2026-27/02
Open Tender
Miscellaneous Works
Works
60 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹50,000
Yes
AGCL, Pipeline Department, Duliajan
20 Jul 2026
22 Jun 2026
8 Jul 2026
22 Jun 2026
7 Jul 2026
22 Jun 2026
22 Jun 2026 - 27 Jun 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DIRECT ASSESSMENT (DA) SURVEY of NATURAL GAS PIPELINES . For 32” N.B. X 1km Length Natural Gas Pipeline | |||||
| 1.01 | Conduct Integrity Inspection for AGCL's pipeline inclusive of all four steps of Direct Assessment (ECDA, ICDA, SCCDA) Methodogy i.e. Pre-Assessment, Indirect Inspection, Direct Examination and Post Assessment. Based on that report, Conduct detailed NDT and assist in Defect Rectification works (if found) for enhancing the economic life of the pipeline for a minimum additional block of 3 years from its already available remaining life. Defect rectification (if found any) will be on AGCL’s scope. After defect rectification, evaluate the remaining life of the pipeline and submit remaining life, safe pressure and fit for use certificate. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_83356.xls
BOQ • 0.38 MB
Corrrigendum1.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .