Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.8 Cr+₹2.0 L (1.18%)Rejected-AOC | ₹1.8 Cr+₹2.0 L (1.18%) | L2 | Rejected-AOC REJECTED |
| 3 | L3₹1.8 Cr+₹4.7 L (2.71%)Rejected-AOC | ₹1.8 Cr+₹4.7 L (2.71%) | L3 | Rejected-AOC REJECTED |
| 4 | L4₹1.8 Cr+₹8.6 L (5.00%)Rejected-AOC BASHAT CHENANI TEH CHENANI DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.8 Cr+₹8.6 L (5.00%) | L4 | Rejected-AOC REJECTED |
| 5 | L5₹1.9 Cr+₹12.7 L (7.31%)Rejected-AOC | ₹1.9 Cr+₹12.7 L (7.31%) | L5 | Rejected-AOC REJECTED |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
15 Apr 2023, 5:00 pmClosed
Office of The Chief Engineer PMGSY(JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1stFloor, Mechanical Engineering Department (MED) Complex University Road Jammu
Balance work for Construction of road from L-027 Kanthan to Sawalkot Part -I , Package No. JK14-439,Phase-X, Stage-I, Block-Arnas, District Reasi
2023_JKRRD_123817_1
e-NIT No CEJ/PMGSY/734 OF 2022-23 DTD 24-03-2023
Open Tender
Civil Works - Roads
Percentage
90 days
ARNAS
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,000
₹5.3 L
Office of The Chief Engineer PMGSY(JKRRDA) Jammu
3 Jun 2023
27 Mar 2023
19 Apr 2023
27 Mar 2023
15 Apr 2023
29 Mar 2023
28 Mar 2023 - 29 Mar 2023
28 Mar 2023
eProcurement System for Pradhan Mantri Gram Sadak Yojana (PMGSY) Created By: PARSHOTAM SHARMA Created Date/Time: 13-May-2023 12:28 PM Tender Title: Balance work for Construction of road from L-027 Kanthan to Sawalkot Part -I , Package No. JK14-439,Phase-X, Stage-I, Block-Arnas, District Reasi Tender ID: 2023_JKRRD_123817_1
Tender Inviting Authority: CHIEF ENGINEER PMGSY JKRRDA JAMMU ON BEHALF OF GOVERNOR OF JAMMU AND KASHMIR UT
Name of Work: Balance work for Construction of road from L-027 Kanthan to Sawalkot Part -I , Package No. JK14-439,Phase-X, Stage -I, , Block-Arnas, District Reasi . Length-21.250 Kms
Contract No. JK14-439 Length: 21.250 Kms
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/S WAZIR MOHD(GSTN-NA) 26525542.70 -34.00 17506858.18 One Crore Seventy Five Lakh Six Thousand Eight Hundred and Fifty Eight
2.00 Mohd Yousuf Shan(GSTN-NA) 26525542.70 -30.00 18567879.89 One Crore Eighty Five Lakh Sixty Seven Thousand Eight Hundred and Seventy Nine
3.00 ABDUL HAJAZ MAGRAY(GSTN-NA) 26525542.70 -33.00 17772113.61 One Crore Seventy Seven Lakh Seventy Two Thousand One Hundred and Thirteen
4.00 Farooq Ahmed(GSTN-NA) 26525542.70 -31.51 18167344.20 One Crore Eighty One Lakh Sixty Seven Thousand Three Hundred and Fourty Four
5.00 Chatter Singh(GSTN-NA) 26525542.70 -27.60 19204492.91 One Crore Ninty Two Lakh Four Thousand Four Hundred and Ninty Two
6.00 A. Q. Shan Construction(GSTN-NA) 26525542.70 -22.99 20427320.43 Two Crore Four Lakh Twenty Seven Thousand Three Hundred and Twenty
7.00 Abdul Qayoom Shan(GSTN-NA) 26525542.70 -34.77 17302611.50 One Crore Seventy Three Lakh Two Thousand Six Hundred and Eleven
Lowest Amount Quoted BY: Abdul Qayoom Shan(17302611.50)
BOQ Summary Details Tender Title: Balance work for Construction of road from L-027 Kanthan to Sawalkot Part -I , Package No. JK14-439,Phase-X, Stage-I, Block-Arnas, District Reasi Tender ID: 2023_JKRRD_123817_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Abdul Qayoom Shan 17302611.50 L1
2 M/S WAZIR MOHD 17506858.18 L2
3 ABDUL HAJAZ MAGRAY 17772113.61 L3
4 Farooq Ahmed 18167344.20 L4
5 Mohd Yousuf Shan 18567879.89 L5
6 Chatter Singh 19204492.91 L6
7 A. Q. Shan Construction 20427320.43 L7
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .