Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 980 C SHANDAMA SHIVPURI ALLAHABAD | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
17 Feb 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E.
S.E.,E.D.C.,AMBEDKAR NAGAR
Electrification And Providing Connection under Deposit Scheme in the Jurdiction Of Electricity Distribution Division-Akbarpur Ambedkarnagar
2021_MVVNL_554106_1
87-EDC(A)/2020-21
Open Tender
Electrical Works
Lump-sum
90 days
Akbarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E.,E.D.C.,Akbarpur,ambedkar Nagar
₹5,000
25 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
17 Feb 2021
10 Feb 2021
90 days
Amount
Cartage including loading ,unloding & proper Stacking of following stock materials from Store Center/Department store to dump site distance to 60 Kms
A. PCC Pole 8.5 mtr Long
B. ACSR Weasel Conductor
C. 3x70 Sq mm XLPE Cable
D. 11 KVA PILFER
E. T/F 25 KVA
F. Cable Jointing kit O/D & I/D
G.Other Matching Material
Dragging of PCC/STP Pole from dump site to pit site
Grouting & Binding of stay in 1:4:8 ratio with ratio Cement, Sand & Brick Ballast including cost of all grouting materials RESSPO Norms.
Earthing of Pole as per RESPO Norms
Febrication and erection of Single PCC Pole including Grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp * earthing as per RESSPO Norms. ( Cost of Clamp borne by contractor)
Febrication and erection of Double PCC Pole including Grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp * earthing as per RESSPO Norms. ( Cost of Clamp borne by contractor)
Stringing, Sagging, bonding and jumpering of ACSR Weasel Conductor as per RESSPO Norms.
Instalation of cable jointing kit I/D& O/D as per RESSPO Norms.
Laying og 11 KV 3X70 mm XLPE Single cable by digging of trench underground ( only XlPE Cable will be supplied by department)
Hosting & Hnaging of 11 KV 3X120 mm XLPE Single cable on double pole structure to giving connection to Transformer ( cost of all accessories will be borne by contractor) as per RESSPO Norms.
Instalation of 11 KVA PILFER as per RESSPO Norms.
Instalation PvC cable 4X25 as per RESSPO Norms.
Mounting of 25 KVA t/F on double pole as per RESPO Norms
Cutting of Tree Branches comeing in the way of LT line
M/S VIDHYA TRADERS
M/s Maa Lakshmi Construction Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .