Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.6 L+₹28,946.61 (6.67%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.9 L+₹57,893.22 (13.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹4.9 L+₹57,893.22 (13.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L3₹4.9 L+₹57,893.22 (13.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.8 L
EMD Value
₹11,580
Closing Date
16 Jul 2026, 6:00 pmClosed
EXEN REW SGR
EXECUTIVE ENGINEER REW SRINAGAR
Construction of Retaining wall with Chainlink fencing Burnnallah near h/o Jamal Mir at Ganiepora Khimber
2026_RDPR_314940_6
ENIT09/REW SGR 2025-26
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹11,580
20 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Demolishing local stone masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 13.63 | Cum | 550 | ₹7,496.5 |
| 0_) | Laying of Stone Solling duly Hand packed in Trenches incl. compaction with hand rammer stones available at site | 13.26 | Cum | 300 | ₹3,978 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but including the cost of centring and shuttering (Using Concrete Vibrator for Compaction of Concrete). All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 47.94 | Cum | 5,733.6 | ₹2,74,868.78 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 97.56 | Sqm | 286.35 | ₹27,936.31 |
| 0_) | P/ Applying 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand | 145.03 | Sqm | 283.8 | ₹41,159.51 |
| 0_) | Structural steel work in built up section (welded) in frame, Trash work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 981.25 | Kg | 138.2 | ₹1,35,608.75 |
| 0_) | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening nuts, bolts and washers as required complete as per the direction of Engineer-in charge Made of G.I. wire of dia 3 mm i/c Painting with synthetic enamel paint of approved brand and manufacture Two or more coats on new work | 97.58 | Sqm | 650 | ₹63,427 |
| 0_) | Carriage of Stone aggregate and Sand material avg lead 15 Km | 65.19 | Cum | 344.49 | ₹22,457.3 |
| 0_) | Add provision for cost of signboard photographs | 1 | Job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1020170.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .