Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹9,160
Closing Date
29 Sept 2026, 6:55 pm2d left
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of Culvert near H/O Rashid Baba at Bustor Khah Nallah at Ramhama Phase-I
2026_RDPR_324913_72
NIT_73_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
Nagam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹9,160
Yes
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N. size) | 5.81 | Cum | 7,104.35 | ₹41,276.27 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 656.43 | kg | 123.2 | ₹80,872.18 |
| 3 | Suspended floors, roofs, landings, balconies and access platforms. | 19.13 | Sqm | 718.2 | ₹13,739.17 |
| 4 | Providing fitting and fixing mild steel railing comlpete as per drawings and technical specifications | 7.3 | Rm | 2,543.3 | ₹18,566.09 |
| 5 | Carriage of materials by mechanical transport a) Coarse Aggregate av lead 15 kms | 5.17 | No | 344.49 | ₹1,781.01 |
| 6 | Carriage of materials by mechanical transport a) Fine Aggregate av lead 15 kms | 2.61 | No | 344.49 | ₹899.12 |
| 7 | cost and carraige of 36'' dia RCC Pipes inc laying etc compelte job | 1 | job | 16,500 | ₹16,500 |
| 8 | Add for CIB unforseen items,dismental of old structure head load etc, to be paid as per actual | 1 | No | 9,600 | ₹9,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1096544.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .