Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC A 91 DEFENCE COLONY AGRA CANTT AGRA UP PIN 282001 | AGRA | UTTAR PRADESH | 282001 | ₹36.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹39.3 L+₹2.9 L (8.00%)Rejected-Finance 59 100 AJIT NAGAR GATE KHERIA AGRA 282008 | AGRA | AGRA | UTTAR PRADESH | 282008 | ₹39.3 L+₹2.9 L (8.00%) | L2 | Rejected-Finance Being other than L1 |
| 3 | L3₹40.1 L+₹3.7 L (10.1%)Rejected-Finance 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | ₹40.1 L+₹3.7 L (10.1%) | L3 | Rejected-Finance Being other than L1 |
| 4 | L4₹42.1 L+₹5.6 L (15.5%)Rejected-Finance | ₹42.1 L+₹5.6 L (15.5%) | L4 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | CHAHAR CONTRACTOR AND SUPPLIERS L4 | deva engineers L2 | Singh construction co. L3 | S R BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc. 30 cm deep and averaging 15cm deep and getting out in soft/loose soil all as specified and directed | 308 | Sqm | 44 ₹13,552 | 20 ₹6,160 Lowest | 52 ₹16,016 | 30 ₹9,240 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, including forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 62 | Cum | 485 ₹30,070 | 250 ₹15,500 | 510 ₹31,620 | 200 ₹12,400 Lowest |
| 3.00 | Excavating in trenches, n exc 1.5 m wide and exc 1.5 m but not exc 3.0M in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, including forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan and getting out in soft/loose soil complete all as specified and directed. | 4 | Cum | 500 ₹2,000 | 400 ₹1,600 | 520 ₹2,080 | 300 ₹1,200 Lowest |
| 4.00 | M&L for PCC (1:4:8) type D2 (using 40mm graded stone aggregates) as in foundation, filling and mass concrete complete all as specified and directed. | 6.5 | Cum | 4,000 ₹26,000 | 3,500 ₹22,750 Lowest | 4,250 ₹27,625 | 3,500 ₹22,750 Lowest |
| 5.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 13.39 | Cum | 100 ₹1,339 | 100 ₹1,339 | 110 ₹1,472.9 | 80 ₹1,071.2 Lowest |
| 6.00 | Removing excavated material (soil) exc 1.5KM and n exc. 5 KM and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 100.2 | Cum | 140 ₹14,028 | 100 ₹10,020 Lowest | 143 ₹14,328.6 | 250 ₹25,050 |
| 7.00 | M&L Treating bottom and sides of excavation at the arte of 5 litres of emulsion per square metre of surface area complete all as specified | 15 | Sqm | 100 ₹1,500 Lowest | 500 ₹7,500 | 110 ₹1,650 | 120 ₹1,800 |
| 8.00 | M&L Treating the backfills in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface ( area of the structure in contact with backfill to be measured) complete all as specified | 10 | Sqm | 140 ₹1,400 | 750 ₹7,500 | 142 ₹1,420 | 120 ₹1,200 Lowest |
| 9.00 | M&L Treating the top surface of filled earth at the rate of 5 lires of emulsion per square metre of surfacecomplete all as specified. | 20 | Sqm | 150 ₹3,000 | 500 ₹10,000 | 165 ₹3,300 | 120 ₹2,400 Lowest |
| 10.00 | M&L for reinforced cement concrete M-25 Design Mix (using 20mm graded stone aggregates) as in footings, foundation, beam, plinth beams, bases for columns etc complete all as specified and directed. | 13.5 | Cum | 9,000 ₹1,21,500 | 7,500 ₹1,01,250 Lowest | 9,150 ₹1,23,525 | 7,500 ₹1,01,250 Lowest |
Tender Value
₹37 L
EMD Value
₹74,000
Closing Date
1 Aug 2026, 6:00 pmClosed
GE TECH AREA AGRA
Military Engineers Services Garrison Engineer (AF) Tech Area Agra - 282008
PROVN OF CCTV MONITORING ROOM AND ASSOCIATED WORKS AND ARBORICULTURE WORK IN HQ OPS COMPLEX OF PTS AT AF STN AGRA
2026_MES_776372_1
8200-1830/E8
Open Tender
Civil Works - Others
Item Rate
180 days
AF TECH ATREA AGRA
Class D and above category a (i)
8 documents required · 8 mandatory
₹500
Yes
GE TECH AREA AGRA
₹74,000
Yes
11 Sept 2026
3 Jul 2026
7 Aug 2026
3 Jul 2026
1 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n.exc. 30 cm deep and averaging 15cm deep and getting out in soft/loose soil all as specified and directed | 308 | Sqm | - | - |
| 2 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, including forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 62 | Cum | - | - |
| 3 | Excavating in trenches, n exc 1.5 m wide and exc 1.5 m but not exc 3.0M in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, including forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan and getting out in soft/loose soil complete all as specified and directed. | 4 | Cum | - | - |
| 4 | M&L for PCC (1:4:8) type D2 (using 40mm graded stone aggregates) as in foundation, filling and mass concrete complete all as specified and directed. | 6.5 | Cum | - | - |
| 5 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 13.39 | Cum | - | - |
| 6 | Removing excavated material (soil) exc 1.5KM and n exc. 5 KM and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 100.2 | Cum | - | - |
| 7 | M&L Treating bottom and sides of excavation at the arte of 5 litres of emulsion per square metre of surface area complete all as specified | 15 | Cum | - | - |
| 8 | M&L Treating the backfills in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface ( area of the structure in contact with backfill to be measured) complete all as specified | 10 | Cum | - | - |
| 9 | M&L Treating the top surface of filled earth at the rate of 5 lires of emulsion per square metre of surfacecomplete all as specified. | 20 | Cum | - | - |
| 10 | M&L for reinforced cement concrete M-25 Design Mix (using 20mm graded stone aggregates) as in footings, foundation, beam, plinth beams, bases for columns etc complete all as specified and directed. | 13.5 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
1830Tender.pdf
Tender Documents • 1.70 MB
BOQ_869400.xls
BOQ • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .