| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹24.7 L+₹8,645.76 (0.35%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Ganesan L1 | SAMBASIVAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Minor Bridge at Kelamangalam Road to MCC @ Uddanapalli H/O Uddanapalli | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 210.51 | cum | 263.38 ₹55,444.12 Lowest | 264.31 ₹55,639.9 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 21.05 | cum | 5,338.9 ₹1,12,383.85 Lowest | 5,357.61 ₹1,12,777.69 |
| 4.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
| 5.00 | Sides | 293.98 | Sqm | 546.68 ₹1,60,712.99 Lowest | 548.6 ₹1,61,277.43 |
| 6.00 | Slab Bottom | 75 | Sqm | 1,093.36 ₹82,002 Lowest | 1,097.19 ₹82,289.25 |
| 7.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 170.16 | cum | 5,640.99 ₹9,59,870.86 Lowest | 5,660.76 ₹9,63,234.92 |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 5.73 | cum | 6,725.48 ₹38,537 Lowest | 6,749.05 ₹38,672.06 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 36.12 | cum | 9,216.72 ₹3,32,907.93 Lowest | 9,249.03 ₹3,34,074.96 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 3.46 | mt | 91,720.71 ₹3,17,537.1 Lowest | 92,042.22 ₹3,18,650.17 |
Tender Value
₹24.9 L
EMD Value
₹25,000
Closing Date
11 Nov 2025, 3:00 pmClosed
The Block Developement Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals 2024_25 Construction of Minor Bridge at Kelamangalam Road to MCC at Uddanapalli in Uddanapalli Panchayat Package No-2025_26_SGI_62
2025_RDTN_619467_1
Rocno_2588_2024_A4
Open Tender
Civil Works
Item Rate
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
Yes
The Block Development Office Shoolagiri
17 Nov 2025
1 Nov 2025
11 Nov 2025
1 Nov 2025
11 Nov 2025
1 Nov 2025
10 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
PB62.pdf
Tender Documents • 0.76 MB
TB62.pdf
Tender Documents • 0.80 MB
BOQ_740606.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .